DOCUMENT CONTROL

Alka RevoMember for 21 years
Created
1
1
0
DO WE HAVE DOCUMENT CONTROL MODULE OR MATERIAL MANAGEMENT MODULE IN P3

1 reply

Oldest first
  1. 0
    Alex Wong ·
    Yes

    Expedition can assist management of documents control

    and linked with P3e, I am not too sure with P3e..??

    Procurement/material Management, you need to customerise your resource table to assist. However, P3 is very limited in material management functionality. P3e is stronger in this area, but not 100% to the basic functionality of a material management system.


    Cheers

    Alex

Log in or join to reply