Instalation problems
In the Open Standard
George GhitaMember for 20 years 11 months
- Created
- 1
- 1
0
After the instalation give me this: "P3 for Windows requires at least Btrieve version 6.12. An earlier version is curently in use or was detected. Close other Btrieve applications and re-run P3. The version currently loaded is located in the C:\WINDOWS\sistem directory"
What can I do?
What can I do?
1 reply
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?