Cumulative Cash Flow Curve?
In the Open Standard
David MosesMember for 21 years 11 months
- Created
- 3
- 1
0
Dear All;
How could I generate the Report of "Cumulative Cash Flow Curve"? Generating of this report for both early and late dates at the same time as a Graphic is easy.
I want to generate this report in CSV, WK1 or WKS format then to create better graphical "Cumulative Cash Flow Curve" presantation reports in excel.
If I am not mistaken I have read the previous postings but I could not manage to find a solution for my concern.
Thanks
How could I generate the Report of "Cumulative Cash Flow Curve"? Generating of this report for both early and late dates at the same time as a Graphic is easy.
I want to generate this report in CSV, WK1 or WKS format then to create better graphical "Cumulative Cash Flow Curve" presantation reports in excel.
If I am not mistaken I have read the previous postings but I could not manage to find a solution for my concern.
Thanks
3 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?