achievable schedule???

Aalap ParekhMember for 20 years 11 months
Created
3
1
0
hi all
after assigning activity scheduled early start .finish.
wat r the things which need to checked to ensure that the schedule is achievable??
thx
aalap_parekh@rediffmail.com

3 replies

Oldest first
  1. 0
    Zhang Haixiang ·
    first set the start date of the project,
    then assign duration for each activity
    then link all acvities with relationship.
    P3 will caculate ES,EF for you.

    If the duration and relationship is reasonable based on your resource availability, then the schedule is achievable.
  2. 0
    Aalap Parekh ·
    hi
    1) can u one tell me how infomakes useful 2 us?
    i don wats it? thnk its link???m confused

  3. 0
    Zhang Haixiang ·
    to use informaker, you need install ODBC driver and config data source,then you can open your project in informaker for reporting.

    there are lots of threads about link MS-Access with P3,
    MS-access is more easy and powerful than informaker.
    In most case, export to excel is enough, if this does not work, try Access. No need to learn informaker.