Skip to content

Compatibility with Mac

Christian Adrian De VeraMember for 23 years 4 months
Created
6
1
0
Has anybody have ever used P3 on a MacPro? does it have any compatibility problems while running the program?

Appreciate your help

Christian

6 replies

Oldest first
  1. 0
    Mimoune Djouallah ·
    eh can you make more precision, which os you are using, what’s the type of processor, intel or powerpc
  2. 0
    Christian Adrian De Vera ·
    Mimoune

    I’m not particulary sure what os they have but what I’m refering is the latest Macbook pro which I think the os is this "Mac OS X v10.4 Tiger". would you have an idea if P3 would on this os? and if it does any problems do you know while running this program under this OS?

    Christian
  3. 0
    Alexandre Faulx-Briole ·
    Christian,
    Primavera P3 was definitely writen to work under MS Windows 3.1; if you can simulate this old OS on your "latest Macbook pro", P3 will work
    I guess this would be a surprise for the whole world!
    Alexandre
  4. 0
    Mimoune Djouallah ·
    as said by alexandre, p3 is writen for windows 3.1. so you have two choice.

    1- use boot camp, it ’s a free software form apple, and install windows xp as a dual boot. but the drawback of this solution is that you have to logout from macos and boot in windows xp in order to use p3.

    2- the second one ( i prefer that) is to use a virtualization software, the best one is parallels,( the last version support 3d game so you can play windows games under macos;) or vmware, or virtualbox ( an open source software)

    just take a look at http://www.parallels.com/products/desktop/

    friendly
  5. 0
    Christian Adrian De Vera ·
    I’ll be considering these options.. thanks!
  6. 0
    Mick MVM ·
    Primavera SureTrack 3.0b with VMware Fusion 1.1 MacOSX 10.4.10 setup works fine. A couple keyboard glitches, very very minor.

Log in or join to reply

ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.

Existing members: your original username and password still work. Forgot password?