Converting to PDF
In the Open Standard
Rick AquinoMember for 21 years 6 months
- Created
- 5
- 6
0
hi all,
i can easily convert an office to pdf, but when i convert primavera file to pdf i’m strugling a lot and not giving good result or no result at all, and if i’m doing it in another computer it is working easily, using the same procedure and the same default, what is the problem with my P3? do i have a problem with my p3 or my computer?
i can easily convert an office to pdf, but when i convert primavera file to pdf i’m strugling a lot and not giving good result or no result at all, and if i’m doing it in another computer it is working easily, using the same procedure and the same default, what is the problem with my P3? do i have a problem with my p3 or my computer?
5 replies
Oldest firstLog in or join to reply