Create Remarks column.
In the Open Standard
Janaki Ram PithaniMember for 20 years
- Created
- 3
- 1
0
Hi Everybody,
I want to create a Remarks column, wherein I can place a text material of unlimited length. This is not to be a part of log we are showing in the bar area. It is just like adding text1, text2 columns in MS Project2000.
Please advise me is it possible in P3.
Bye
PJR
I want to create a Remarks column, wherein I can place a text material of unlimited length. This is not to be a part of log we are showing in the bar area. It is just like adding text1, text2 columns in MS Project2000.
Please advise me is it possible in P3.
Bye
PJR