P3 causes general protection fault in .dll
In the Open Standard
R KMember for 17 years 8 months
- Created
- 0
- 2
0
I know there are folks out there getting this error, I’ve searched the web and the only reference was on this forum, but the fix given was’t the answer to the problem.
Here’s the error:
P3 caused a General Protection Fault in module CORSRVR.DLL at 000A:399A.
If anyone has any answer as to why this is happening, I’d be extremely grateful.
running p3 w/ sp3 and windows xp w/ sp3 all updates and patches for windows are installed.
Here’s the error:
P3 caused a General Protection Fault in module CORSRVR.DLL at 000A:399A.
If anyone has any answer as to why this is happening, I’d be extremely grateful.
running p3 w/ sp3 and windows xp w/ sp3 all updates and patches for windows are installed.
Replies
Oldest firstNo replies yet. Be the first to answer.
Log in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?