Skip to content

P3 Manual

Brian MittonMember for 18 years 7 months
Created
8
4
0
G’day Guys,

Any one got a P3 operating manual in .pdf for me?

Much appriciated.

Cheers

8 replies

Oldest first
  1. 0
    Shah. HB ·
    Hi Brian

    Have a look of it and you can purchase related books too

    http://www.eh.com.au/downloads_completed_workshops.html
  2. 0
    Rodel Marasigan ·
    Hi Brian,
    Click Link below to download P3 manual.
    [LINK REMOVED BY GARY W]
  3. 0
    Brian Mitton ·
    Cheers Rodel...thanks for your response.
  4. 0
    Rodel Marasigan ·
    No worries Brian,
    Here is another one.
    [LINK REMOVED BY GARY W]
  5. 0
    Gary Whitehead ·
    Rodel,

    This document is copyrighted. -Do you have written permission from Primavera to share it like this?

    On the assumption that you do not, I have removed the links. This site does not support copyright theft.
  6. 0
    A D ·
    Hi Gary,

    I dont know, what the link was, but P3 manual was available for free download on primavera’s website from last so many years.

    So, if the link is from primavera’s ftp site, there is no copyright violation in sharing the link. If there is any copyright issue is there, then they must have asked for serial number or something like that to check weather the user is having genuine software or not?

    Here’s the definition from wikipedia of copyright violation

    Copyright infringement (or copyright violation) is the unauthorized or prohibited use of works covered by copyright law, in a way that violates one of the copyright owner’s exclusive rights, such as the right to reproduce or perform the copyrighted work, or to make derivative works.

    P6 manuals are also available on primavera’s ftp site and anybody and everybody can download the manual without any password or condition weather he is using primavera or not.

    Here’s the link for P6 manual:
    http://ftp.primavera.com/docs/6.0/ConstEng/

    Since, PP is having tie-up with oracle and you are one of the moderators, will you please confirm with oracle regarding teh copyright issue. If there is no such issue, keep the links so that PP members can avail the facilities and PP can live with its words of "For the Planners By the Planners"
  7. 0
    Rodel Marasigan ·
    Hi Gary,
    Just for curiosity, if Primavera is protecting their copyrighted books why they open the port for public use ex: Primavera Docs Public and you can Google it.
  8. 0
    Gary Whitehead ·
    Hi Rodel & Raviraj,

    I have previously asked Primavera if they were happy for us to share electronic copies of the manual but they have never responded, so I am having to decide for myself. If they ever do get back to me, I’ll be more than happy to change my position. -I don’t like denying fellow planners useful information.

    Even if the document is / was given away freely, Primavera retained the copyright protection.

    My understanding is that if we share links to primavera’s ftp site, that is not copyright infringement. If we share links to Primavera’s copyrighted documentation held on sites Primavera do not control, that is.

    I believe Primavera no longer wish to make the P3 manual available for download, since it has been removed from their ftp site.

    I am no expert in copyright law, and am happy to be proved wrong.

Log in or join to reply

ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.

Existing members: your original username and password still work. Forgot password?