Activity codes and WBS
In the Open Standard
Suraj BhattMember for 22 years 5 months
- Created
- 1
- 13
0
Dear All!
Help neede on two areas:-
1. When I copy and paste a WBS(with activities and a lower lever WBS within),P6 does not ask for a prefix or suffix for renaming new Activity codes for the new activities formed(like in p3.1).It increments them automatically instead (even when I have unmarked the copy Activity codes option).
How to rename the new formed(after pasting)activities optimally without having to edit them one by one?
2.How to correct Activity codes in excel so that while importing to P6 it updates the existing and not forms a new feild?
Thanks in advance
Suraj
Help neede on two areas:-
1. When I copy and paste a WBS(with activities and a lower lever WBS within),P6 does not ask for a prefix or suffix for renaming new Activity codes for the new activities formed(like in p3.1).It increments them automatically instead (even when I have unmarked the copy Activity codes option).
How to rename the new formed(after pasting)activities optimally without having to edit them one by one?
2.How to correct Activity codes in excel so that while importing to P6 it updates the existing and not forms a new feild?
Thanks in advance
Suraj
1 reply
Oldest firstLog in or join to reply