Oil gas planner

Joshi NirajMember for 21 years 8 months
Created
31
6
0
If someone have 10 years experience of Civil construction of buildings and power plants, can oil gas companies accept this type of planners or oil gas experience is entirely different?

Plz suggest that how on can change above experience from construction to oil gas? I think this will only happen when Oil gas accept such planner? what u suggest?

Moreover please intimate us the onshore and offshore salary difference in this respect

If someone is interested from Oil gas field to adopt such planners, please inform me.

31 replies

Oldest first
  1. 0
    Jaco Stadler ·
    hi Joshi

    I would like to suggest that you talk to your supervisor.
    But I need to explain something WE all make decisions in our life’s. At one time you decided civil was for you. Why did you make this. What have change?. Also remember a 10 year experiance in civil is more salary than an trainee M&E.

    In civil their is more opurtunity’s. but in Petro Chem it is different.

    To give an example what is stress relieving. And how do you do it. And why.
  2. 0
    Raj Maurya ·
    Planning fundamentals are same in any field of planning, so one who have planning skill & experience could work in any field. Only thing in case of Oil /Gas, you need to know what are the basic things and what type of facilities required to produce & transport Oil/Gas, what are the Hazards, Risks and basic terminology of the Oil/Gas. I think civil planner can get entry in facilites construction in Oil and Gas.
  3. 0
    Jaco Stadler ·
    I tend to disagree.

    Planning fundamentals might be the same but Planning fundamentals only take care of the scheduling portion of being a planner. A true planner needs to have a technical experiance as well.

    If wat you are saying is true then a person can just go and do a short course in planning and call himself a planner.

    Remember Planning is About Planning & Scheduling.
  4. 0
    Sukumaran Subaramaniyan ·
    Also if the planner involve in pipeline work, he must be able to read the line diagram, identify total number of joints, valves location, welding period (eg. 22~25 dia inch/hr), x-ray etc.

    Regards.
  5. 0
    Dayanidhi Dhandapany ·
    Niraj, If you work in Offshore field you will get more pay and leave rotation, but you will fed up with your life finally. Oil and Gas field is tough as compared with others, there is no life(you can’t enjoy city life) in it. Cheers!!! Daya
  6. 0
    Raj Maurya ·
    Once we are talking about Planning Engineer we should assume that the person has minimum engineering degree (not only short term course) and more ever I was replying in case of 10 years experience Civil Planner. Who almost knows the required technical back ground of the projects.
  7. 0
    Joshi Niraj ·
    Plz acknlowledge that OIL gas planners are the best pay master than civil construction although it is tough job.

    Also it seems that this job is fit for LONELiness pepole who are totally stagnant

    Anyhow can civil engineer enter into oil gas field, still require answer
  8. 0
    Sukumaran Subaramaniyan ·
    Joshi,

    If you are realy want to move to oil&gas field, try to join Plant Turnaround team. In Plant Turnaround they have Mechanical Planner, Machinery Planner, Electrical Planner and Instrument Planner. The planners will prepare job method sheets (JMS) that contains job description, manpower (manhour) & equipment information. As a scheduler you will use the JMS to develop the schedule for the contractors.

    Once you gain the experience in Plant Turnaround you can move to project in oil&gas field.

    Regards.
  9. 0
    Joshi Niraj ·
    Your mentioned list of planner do not show Civil Planner which reflect that there is no need of Civil Planner in Oil Gas. Am I right?

    If any place for Civil Planners, please mention
  10. 0
    Jaco Stadler ·
    Strange

    The Highiste Paid Planner is

    1) Pharmaceuticals
    2) Transportation
    3) Construction



    7) Oil & Gas
  11. 0
    Philip Jonker ·
    In my experience, the more trouble the job is in time wise, the more they are prepared to pay, regardless of discipline, for somebody to help them out of the quagmires, which they land themselves in the first place, by only looking at the financial side in the first place when selecting people.
    I think what Bill has to say, especially where you are from, definitely plays a role in the ME. I have experienced this, and recruiters openly admit it. I also think you cannot generalise on rates prer discipline, as a lot of other factors play a role in projects, suchas risk, size of projects, and various other factors. Availability or non-availability of experienced people at the time can also affect rates.
  12. 0
    Jaco Stadler ·
    Good Morning Bill

    Are you a AACE Member. If not Why Not especialy since you are from the States.

    They have something they call a salary survey this is compiled by a couple thousand persons (Annualy)in project controls discipline world wide.

    After they have done the survey they publish a report.

    This Report covers gives you the avarege etc by the following
    Gender
    Discipline
    Country
    Qaulifications
    etc.

    It is quit a good document to have access too. I use it primary for info. Well honest the first time I read it I wanted to see how my salry compared to the rest of the world.

    And believe me I am stil underpaid & overworked.

    Cheers

    Oops before I forget if it is money we are intersted in what about Iraq.


  13. 0
    Philip Jonker ·
    Hi Jaco,

    Maybe underpaid, but I see you are still very active here on PP.

    Here everybody is looking for planners, had about 10 calls in the last week and a half, maybe time to come home.

    Regards

    Philip
  14. 0
    Jaco Stadler ·
    Hi Bill
    Strange this data is in the member only zone so how did you manage to see it?

    Also remember what you see is the average and the variable so if you ad the two together it should give you a top end figure

    Example a planner in Georgia

    AVE = 83 std deviation is 30 k 34 people

    Then when you go further you start looking at experiance etc
  15. 0
    Sukumaran Subaramaniyan ·
    Hi Joshi,

    In Plant Turnaround there is no civil planner. Usually they refer the P3/MSP planner as a scheduler.

    Regards.
  16. 0
    Philip Jonker ·
    Hi Jaco/Bill,

    Is it not possible that the AACE survey is a bit subjective in that it is carried out amongst it’s members?

    Secondly, nobody has so far made any mention of multi-disciplinary planners, which there is a few of. Where do they fit in this picture? If you look at some of the PP members’ profiles, multi-disciplinary planners is a fairly prolific breed, however, that is not what I experience in the field.

    Regards,

    Philip
  17. 0
    Jaco Stadler ·
    Hi

    Philip

    Maybe AACE survey is based on members only but 1 100 members (World wide) contributed to this survey. I say looking at the numbers it can not be that far out.

    Maybe we should ask PP to something the same.

    MD planners are as far as I am concern is few. I know approx 10 True Multi Discipline Planners.

    Cheers


  18. 0
    Raj Maurya ·
    I think most of the Good Consultants and multi discipline EPC contractors are having good multidiscipline planner and so they are not less in numbers.
  19. 0
    Puneet Gupta ·
    Hi

    Yes ofcourse you can come as a petrochemical planner.
    If you dont want to go on sites, then you can join an engineering company and plan & control the E/P part.

  20. 0
    Joshi Niraj ·
    Thanks gupta you are one who give me true guidance
  21. 0
    Sunil Kumar ·
    Joshi I did try like you for O&G and I have a similar background as you but never made it...till now

    Any Takers ???

    P.s. Trust my present employer is not a member in this forum


    Cheers

    Sunil
  22. 0
    Shahzad Munawar ·
    Joshi

    Better to carry out your job in civil construction afterall u spent 10 years in this field so at this stage it is not viable to change job
  23. 0
    Sukumaran Subaramaniyan ·
    Joshi,

    The choice is yours. Best wishes for your future undertaking.

    Regards.
  24. 0
    Sandy Matheson ·
    Has this guy gone into the funeral business then????
  25. 0
    Dattatreya Padharthi ·
    One is an incomplete planner without Construction/Commissioning planning experience. This is especially true in Oil/Gas sector and working in EPC companies.
    Working in E&P companies is really enjoyable not much at stake.
    You prepare plans for Basic Engg, Design & Procuremnt. If the Contract is E&P, What is the completion date? i.e delivery dates right from Equipment bolts/ Equipments/Piping materials to Field Instrument.
    Real challenge of planning in Oil/Gas sector lies in total Planning right from Concept to commissioning.

    Please correct me if I am wrong.

    Regards
    PS Dattatreya
  26. 0
    Dayanidhi Dhandapany ·
    DATTATREYA,

    Well said, I like this sentence "Real challenge of planning in Oil/Gas sector lies in total Planning right from Concept to commissioning". I heard about decommissioning, bye the way
    Do you have any experience in decommissioning?......

    Cheers!!!

    Daya
  27. 0
    Dattatreya Padharthi ·
    Dear Daya,
    I would love to experience de-commissioning (playfully).
    Actually, if someone can inform about the details of the following project, it would be worthwhile
    " A Chemical Plant was transferred/shifted/shipped from the shores of Africa to India (not in one piece) and then replanted & commissioned".
    I hope someone throws a light about this venture.

    Cheers!
    Dattatreya
  28. 0
    Gwen Blair ·
    A few projects around like this.
    One in progress is on Cork (S.Ireland) harbour.
    I beleive a fertiliser plant is being stripped, cut, shipped to Chile for reconstruction and commissioning.
    Jacobs Engineering may have the contract.

  29. 0
    Charleston-Joseph Orbe ·
    Hello Joshi,

    You, civil planner, can work in the oil/gas sector as long as you know the fundamentals of planning, generally in the Primavera P3 envionment. You also need to have an understanding of the process (a lot of process in the oil and gas due to corporate patents), piping, P&I D and commissioning sequence. If you will work with an EPIC contractor, then, you need to be conversant in the planning phase from Engineering, Procurement, Installation (Construction) and Commissioning. Sometimes you will also do shutdown planning and scheduling. You also have to take note of long lead items in your procurement schedule since most of the equipment will be manufactured in other countries, will be ship and will be installed at site.

    You will be tempted to elaborate on the civil side to the planning. However, you will notice that the civil portion is minimal compared to the overall scope of work including the value of work. The bulk of the scheduling inputs will be in the mechanical, electrical, control and instrumentation and commissioning. You will start to hear new productivity jargon: dia inch, tonnes of stell pipes, etc. Also be prepared for the challenge since you will be dealing with diverse professional and specialist, mechanical, electrical, control and instrumentation, commissioning, etc.

    Eventually, you will start to listen to your heart if you are really interested in this kind of environment. Also you will take a hard look of you career advancement.

    Good luck and i wish you all the best in your decision
  30. 0
    Philip Jonker ·
    Hi Charjston,

    Remind them of the safety aspects and the rest, I like your posts, some practicality there, or pragmatisism ( experience)
  31. 0
    Jim Smith ·
    Bill I agree,

    Some people have a lot of experience from a previous career in science / engineering and are executing a career x-over. They don’t have the experiential planning knowledge but are real keen to learn real quick and dedicate themselves to sucess. It’s amazing what a difference that makes.

    Jim

Log in or join to reply