multiple screens and use of multiple instances
In the Open Standard
Rafael DavilaMember for 22 years 7 months
- Created
- 7
- 4
0
Vladimir,
I just bought a second LCD screen for my notebook for about 140$ US or 100 euros. I bought it because I need it to review shop drawings and at the same time prepare AutoCAD drawings looking at the details on the structural drawings and submitted shop drawing on my second screen. I can easily setup my second screen to tile windows in two while I draw on my notebook screen as follows.

I tried to do the same with Spider Project using multiple instances of Spider to run twice the same job at the same time but could not get the tiling I can get with Adobe PDF. Because both documents on my second screen are opened with Adobe perhaps it is controlled in part by the software. The following is what I got with spider.

Can you give me some hints on how to use multiple screens with Spider and on how best to use multiple instances of Spider Project?
Best Regards,
Rafael
I just bought a second LCD screen for my notebook for about 140$ US or 100 euros. I bought it because I need it to review shop drawings and at the same time prepare AutoCAD drawings looking at the details on the structural drawings and submitted shop drawing on my second screen. I can easily setup my second screen to tile windows in two while I draw on my notebook screen as follows.

I tried to do the same with Spider Project using multiple instances of Spider to run twice the same job at the same time but could not get the tiling I can get with Adobe PDF. Because both documents on my second screen are opened with Adobe perhaps it is controlled in part by the software. The following is what I got with spider.

Can you give me some hints on how to use multiple screens with Spider and on how best to use multiple instances of Spider Project?
Best Regards,
Rafael
7 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?