M3.2 Budgeting & Cost Baselines

By the end of this section, the learner should be able to turn an approved estimate and authorised project scope into a controlled cost budget and time-phased cost baseline that can be used to plan, measure and govern project cost performance. They should be able to allocate budget to the project control structure, define accountable ownership, distinguish base budget from contingency or reserve, phase budget in a way that reflects the delivery plan, reconcile cost and schedule assumptions, distinguish the cost-control baseline from cash flow and current forecast, and preserve an approved reference so that later variance and authorised change remain visible.

Knowledge

Articles and chapters

  • M6.4 — Assurance & Control Reviews

    By the end of this section, the practitioner should be able to plan and conduct a proportionate review of project-controls data, processes and outputs; test evidence against stated criteria; identify material weaknesses; communicate their consequences; and verify corrective action. They should distinguish…

    22 Oct 2026
  • M6.3 — Baseline Change & Configuration Control

    By the end of this section, the practitioner should be able to turn a bounded approval into a verified revision of the affected scope, schedule, budget, progress, risk and configuration records. They should preserve previous baselines, maintain relationships between approved, forecast and as-built information,…

    22 Oct 2026
  • M6.2 — Change Control

    By the end of this section, the practitioner should be able to recognise a potential change, record and define it, assess integrated consequences, identify the correct authority, support an approve/reject/defer decision and track implementation to verified closure. They should distinguish a changed requirement…

    22 Oct 2026
  • M5.3 — Integrated Cost & Schedule Performance

    By the end of this section, the practitioner should be able to connect authorised scope, time-phased budget, evidence of accomplishment and incurred cost at a common cut-off. They should calculate and interpret basic Earned Value Management measures, reconcile them to source records, distinguish cost efficiency…

    22 Oct 2026
  • M5.1 — Performance Measures & Indicators

    By the end of this section, the practitioner should be able to turn a project objective and a management decision into a small, coherent set of performance measures. They should define what each measure means, calculate it from controlled evidence, establish an appropriate reference and response threshold,…

    22 Oct 2026
  • M4.5 — Contingency & Uncertainty

    By the end of this section, the practitioner should be able to establish, explain, govern and reassess cost and schedule provision for uncertainty without hiding it inside the base plan. They should be able to distinguish base budget or duration from contingency.

    22 Oct 2026
  • M3.5 — Cost Forecasting & Commercial/Contract Interfaces

    By the end of this section, the learner should be able to produce and challenge a credible cost forecast that explains what the project or package is now expected to cost, why that expectation differs from the authorised baseline or prior forecast, what commercial and delivery assumptions affect outcomes.

    21 Oct 2026
  • M3.4 — Cost Control & Variance Analysis

    By the end of this section, the learner should be able to use the approved cost baseline and the reliable current cost position established in M3.3 to determine where cost performance differs from plan, explain why it differs, judge whether the movement is temporary or structural.

    21 Oct 2026
  • M3.2 — Budgeting & Cost Baselines

    By the end of this section, the learner should be able to turn an approved estimate and authorised project scope into a controlled cost budget and time-phased cost baseline that can be used to plan, measure and govern project cost performance.

    21 Oct 2026
  • M3.1 — Cost Estimating & Basis of Estimate

    By the end of this section, the practitioner should be able to turn authorised scope and available project information into a traceable cost estimate whose quantities, rates, productivity assumptions, methods, exclusions and uncertainty can be understood, challenged and reproduced.

    21 Oct 2026

Discussions

Discussions

No discussions tagged yet

Discussions appear here once a topic is linked to this subject.

Blogs

Thought leadership

  • PROCEDURES No 16 – Quality Standards

    Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…

    PP Admin

    23 Aug 2026
  • PROCESSES No 9 – Earned Value Management – now over 60 years old – Is there anything new to say about problems in its implementation?

    Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…

    Admin Team

    12 May 2026
  • Projects…Start with What & Why

    What are we doing? And why are we doing it? These are the first two critical questions that must be asked at the start of every project. However, they often go unanswered!The nominal “what” is often provided. Implement a new system. Launch a new program. Build a road or bridge. However, the “why” is

    Alan Zucker

    7 Jul 2025
  • Everyday Agile Practices

    Agile seems like a mystery to many. It has an unfamiliar vocabulary and practices. To outsiders, it feels like an exclusive club. However, when we step back and inspect agile, we see that it follows common, recognizable patterns from our daily lives.

    Alan Zucker

    1 Jun 2023
  • Is Your Agile Project Healthy?

    Experienced agile coaches and practitioners develop a sixth-sense. They can quickly assess the health of an agile project or team just as doctors do with their patients. In 2013, Mike Cohn coined the term scrum smells to describe the signs that a scrum team is in trouble. In my agile training and…

    Alan Zucker

    4 Aug 2019
  • An Ounce of Prevention is Worth a Pound of Cure

    Ben Franklin was a an American founding father, inventor, diplomat, and philosopher. He also wrote Poor Richard’s Almanacwhich contained information for farmers and timeless adages. When it comes to project management, two quotes come to mind:“An ounce of prevention is work a pound of cure”and“A…

    Alan Zucker

    2 Aug 2018

Jobs

Roles asking for this

No live jobs tagged yet

Jobs appear here once a recruiter links the role to this subject.

Norms & Rates

Rates, norms and durations

No norms tagged yet

Rates, norms and durations appear here once entries are linked to this subject.

Resources

Papers, standards and tools

No resources yet

Summaries of papers, standards and tools are added by editors and appear here once published.