Skip to content

Open Standard · M2 Planning & Scheduling

Logic

17 knowledge pages4,160 discussions24 blogs5 jobsAlso: relationships, lag, lead, leads and lags, finish-to-start, start-to-start

Knowledge

Articles and chapters

  • M6.5 — Claims & Forensic Analysis

    By the end of this section, the practitioner should be able to preserve relevant records, define a forensic question, establish a reliable chronology, test cause and effect across schedule and cost, distinguish facts from assumptions and produce reproducible findings. They should understand how project-controls…

    22 Oct 2026
  • M6.4 — Assurance & Control Reviews

    By the end of this section, the practitioner should be able to plan and conduct a proportionate review of project-controls data, processes and outputs; test evidence against stated criteria; identify material weaknesses; communicate their consequences; and verify corrective action. They should distinguish…

    22 Oct 2026
  • M6.3 — Baseline Change & Configuration Control

    By the end of this section, the practitioner should be able to turn a bounded approval into a verified revision of the affected scope, schedule, budget, progress, risk and configuration records. They should preserve previous baselines, maintain relationships between approved, forecast and as-built information,…

    22 Oct 2026
  • M5.1 — Performance Measures & Indicators

    By the end of this section, the practitioner should be able to turn a project objective and a management decision into a small, coherent set of performance measures. They should define what each measure means, calculate it from controlled evidence, establish an appropriate reference and response threshold,…

    22 Oct 2026
  • M4.4 — Risk Response & Control

    By the end of this section, the practitioner should be able to turn an analysed threat or opportunity into a controlled management response that is proportionate, owned, time-bound and integrated with the way the project is actually delivered.

    22 Oct 2026
  • M4.3 — Quantitative Risk Analysis

    By the end of this section, the practitioner should be able to take a defined project objective, a credible current schedule or cost model, and a selected set of material uncertainties and turn them into a transparent quantitative view of possible outcomes.

    22 Oct 2026
  • M4.1 — Risk Identification & Assessment

    By the end of this section, the learner should be able to establish a disciplined risk-identification process that finds, frames and records uncertainty before it is scored or modelled. They should be able to distinguish risks from issues, assumptions, dependencies, decisions and actions.

    22 Oct 2026
  • M2.5 — Schedule Forecasting & Analysis

    By the end of this section, the learner should be able to take a credible current schedule and use it to forecast likely future outcomes, explain what is driving those outcomes, test alternative scenarios, assess the effect of uncertainty and management interventions.

    21 Oct 2026
  • M2.4 — Progress Updating & Schedule Control

    1. Practical outcomeBy the end of this section, the learner should be able to take an approved schedule and turn it into a trustworthy current control model at each reporting cycle. They should be able to establish a clear data date, collect and validate actual progress, record actual starts and acomplishments.

    21 Oct 2026
  • M2.3 — Resources, Productivity & Schedule Optimisation

    By the end of this section, the learner should be able to test whether a logically valid schedule is actually deliverable with the people, skills, equipment, facilities and other constrained resources available to the project. They should be able to distinguish resource demand from capacity.

    21 Oct 2026

Discussions

4,156 discussions

  1. 1reply
    SDEF
    Planning, Scheduling & Programming Discussionby Jesse Hall· 8 years ago
  2. 1reply
    Material Cost showing Beyond Finish Date
    Planning, Scheduling & Programming Discussionby Manu Vargz· 8 years ago
  3. 1reply
    Structuring/Planning a project without "Start" / "Finish"
    Planning, Scheduling & Programming Discussionby John Flix· 8 years ago
  4. 1reply
    Understanding required regarding (unite/time & standard rate) how it' works during cost loading w.r.t units.
    Planning, Scheduling & Programming Discussionby Abubakar Munir· 8 years ago
  5. 1reply
    Primaver 16.2.5 - importing Global Codes
    Planning, Scheduling & Programming Discussionby Will Masson· 8 years ago
  6. 1reply
    Weekly Report Dilemma
    Planning, Scheduling & Programming Discussionby D Artagnan· 8 years ago
  7. 1reply
    Resource Not Visible in dictionary though shows assigned
    Planning, Scheduling & Programming Discussionby Shashikant MIstry· 8 years ago
  8. 1reply
    Summary vs High Level Activity
    Planning, Scheduling & Programming Discussionby Ahmet Tuter· 8 years ago
  9. 1reply
    AEC Standard File Directory Structure for Project Schedules - ideas and tools?
    Planning, Scheduling & Programming Discussionby John Reeves· 9 years ago
  10. 1reply
    Pre-Engineered Metal Building Scheudle
    Planning, Scheduling & Programming Discussionby Najeebullah Safi· 9 years ago

2,671–2,680 of 4,156

Blogs

Thought leadership

  • How Project Planners Should Deal with a Difficult Client PMO

    Ten ways to keep your client happy, protect your construction programme and build stronger working relationships.Every construction planner knows that keeping the client happy matters. But what…

    Sunchana Johnston

    17 Oct 2026
  • Sunchana’s P6 Lancelot Meets OPC Star Wars

    Several months ago, I was engaged as the planning lead with one of the most significant infrastructure organisations.My assignments appeared straightforward: to provide independent planning expertise and advise senior stakeholders on the most appropriate software solution to support the extensive…

    Sunchana Johnston

    10 Aug 2026
  • PROCEDURES No 14 – Minimum Planning Expectations from THE MANAGEMENT!

    Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…

    PP Admin

    20 Jul 2026
  • Projects…Start with What & Why

    What are we doing? And why are we doing it? These are the first two critical questions that must be asked at the start of every project. However, they often go unanswered!The nominal “what” is often provided. Implement a new system. Launch a new program. Build a road or bridge. However, the “why” is

    Alan Zucker

    7 Jul 2025
  • Managing Project Assumptions & Risks

    We make hundreds of assumptions and take small risks daily. Without them, we would spend innumerable hours worrying about everything. We assume our car will start. Our air conditioner will work. The weather forecast is accurate. These daily assumptions are banal.

    Alan Zucker

    4 Sept 2023
  • Work = Life Priorities

    Balancing our work and home lives is a challenge that nearly everyone faces. I was a single parent for many years and managed large teams and projects in Fortune 100 companies. It was not always easy. Recently, I was talking to an old friend and former colleague. When we worked together, she did not

    Alan Zucker

    4 Dec 2020

Jobs

Roles asking for this

  1. Planning Planet LondonPermanent Employment
    TBC
  2. London (EU.UK.LON)Permanent EmploymentCivil / Building / E&M
    £85,000 + car or allowance (circa £6,500) + excellent staff benefits
  3. ManchesterPermanent EmploymentCivil / Building / E&M
    £100-130,000
  4. MacclesfieldPermanent EmploymentCivil / Building / E&M
    £95,000
  5. LondonPermanent Employment
    TBC

Norms & Rates

Rates, norms and durations

No norms tagged yet

Rates, norms and durations appear here once entries are linked to this subject.

Resources

Papers, standards and tools

No resources yet

Summaries of papers, standards and tools are added by editors and appear here once published.