why does MSP prorates resorces in resource leveling?
In the Open Standard
Ersin NamliMember for 21 years 3 months
- Created
- 4
- 7
0
Hi, I want to ask something about leveling with MSP. When i solve the leveling problems with hand method i can reach better solutions becouse MSP allocate resources in prorated form. I couldn’t find how to make that optimization of resource allocation automatically with MSP. If there is possibility i can send you the sample projects. Thanks for yuor attention.