How to see (explore) the source of linked field.
In the Open Standard
Evgeny Z.Member for 18 years 9 months
- Created
- 1
- 4
0
I am just playing around with Linked fields in Ms project (Paste Special => Paste Link). This seems to be quite a powerful feature especially taking into account, that one can link both within file as well as even to outside file (e.g. even to Excel) .
However the big problem is that it seems to impossible to see where the field is linked to. One can see, that there is a linked field (little triangle and “Linked Fields” flag), but I found no way to see, where it is actually linked to
Any idea how I can see it?