Primavera Critical import issue
- Created
- 5
- 1
During Import of XER file the appication is intercepted. Then it is not possible to start P6 at all.
Log file:
Bad Data Row for table UDFTYPE
UDF_TYPE_ID = 828
TABLE_NAME = TASK
UDF_TYPE_NAME = user_field_828
UDF_TYPE_LABEL = OLD_MS_UID
LOGICAL_DATA_TYPE = (null)
SUPER_FLAG = (null)
INDICATOR_EXPRESSION = (null)
SUMMARY_INDICATOR_EXPRESSION = (null)
I understand that it could be something wrong with the XER file but really surpriseby that P6 is so unstable. It is absolutelly abnormal that one bad import can kill the whole sysem.
It is something easy to fix or the only way is to re-install P6?
5 replies
Oldest firstLog in or join to reply