Installing P3 Enterprise

George BoltonMember for 20 years 11 months
Created
5
3
0
Hi, I tried to install Primavera Enterprise 4.0 and Primavera E&C 4.0 on my computer, but I’ve had problems. It asked me to select a connection to a database (Oracle, SQL Server and other). The thing is that I didn’t have these problems when installing P3 3.0 or 3.1 version. Isn’t P3e or P3e/c a software that you can install on your PC? Does it only work with server-based databases, such as Oracle, SQL Server and so on? One more question: Can you have both P3 3.1 and P3e or P3e/c versions together on the same computer? THANK YOU VERY MUCH IN ADVANCE.

5 replies

Oldest first
  1. 0
    Christian Adrian De Vera ·
    Hello George

    When installing P3ec v4 as standalone you should select interbase as its database (your cd should have it)...
    about P3 3.1 with P3ec, both can be installed in the same computer at the same time (you could also run them both at the same time)

    Hope this answer your question...

    Kind regards

    Christian
  2. 0
    George Bolton ·
    Thanks for your answer. Actually, I could install them (P3e and P3ec) selecting INTERBASE (something like that). I did the installation on a computer running on a LAN network. Now, when I launch the Project Manager, it (either P3e or P3ec) is asking me a Password (Login Name is ’admin’), and therefore I CAN’T start working with any of these versions of Primavera. What is this password if I don’t remember registering any of these information (the login and password)? Once again, thanks for your help.
  3. 0
    Ronald Winter ·
    Actually, the logon ID and password for Interbase is "privuser". Good luck!
  4. 0
    George Bolton ·
    I didn’t know Interbase is in the disk, do you install it separately or is it supposed to be installed together when you do all the installation process? Again, tahnk you very mucho for your help.
  5. 0
    Bill McMichael ·
    George,

    Interbase is installed as part of the "stand-alone" installation option in versions 4.1 or lower. In version 5.0, MSDE is the standalone database installed. Interbase is not a separate install. Just follow the setup wizard, it will install the client applications , install the database, and configure it.

    Regards,
    Bill