No Subject Specified
In the Open Standard
Kevin MatthewsMember for 20 years 3 months
- Created
- 2
- 2
0
actvtype and actvcode as requested...?
ACTVTYPE
%F actv_code_type_id actv_short_len seq_num actv_code_type proj_id wbs_id actv_code_type_scope
%R 7364 4 16200 Responsibility # 705 7678 AS_EPS
%R 7365 8 16191 Area/Department AS_Global
%R 7366 8 16182 Discipline # 705 7678 AS_EPS
%R 7367 8 16190 Phase # 705 7678 AS_EPS
%R 7535 7 16184 Area # 705 7678 AS_EPS
%R 7733 7 16181 Selection Code # 705 7678 AS_EPS
%R 7765 7 16180 Facility # 705 7678 AS_EPS
%R 7852 7 0 PHASE 853 AS_Project
%R 7853 4 16170 Responsibility 854 AS_Project
%R 7854 8 16180 Area * 854 AS_Project
%R 7855 8 16190 DISC 854 AS_Project
%R 7856 8 16200 Work Phase 854 AS_Project
%R 7857 7 16300 Subject 854 AS_Project
%R 7858 7 16400 FILTER 854 AS_Project
%R 7859 7 16191 Offshore / Nearshore Pipelay 854 AS_Project
%R 7860 7 16192 Onshore Installation 854 AS_Project
%R 7861 7 16193 Rock Dumping 854 AS_Project
%R 7862 7 16194 Linepipe 854 AS_Project
%T ACTVCODE
%F actv_code_id parent_actv_code_id actv_code_type_id actv_code_name short_name seq_num
%R 14995 7364 Chevron CVX 10
%R 14997 7364 Anton Rogers ARO 20
%R 14999 7364 Clive Rawson CRA 40
%R 15000 7364 Callum Wardlaw CWA 50
%R 15001 7364 Ellen Coenra ECO 60
%R 15002 7364 Gary Ollerhead GOI 70
%R 15003 7364 James McKechnie JMC 80
%R 15005 7364 Luke Caputi LCA 100
%R 15007 7364 Dave Keilty DKE 102
%R 15009 7364 Dave Robertson DRO 105
%R 15013 7364 Mike Howitt MHO 120
%R 15015 7364 Nick Brown NBR 140
%R 15016 7364 Patrick Flynn PFL 150
%R 15017 7364 Rebecca Gamble RGA 160
%R 15018 7364 Silvana Ferrario SFE 170
%R 15020 7364 Tom Northwood TNO 190
%R 15021 7364 Tim Walker TWA 290
%R 15022 7364 Subsea Equipment Vendor SEV 390
%R 15025 7365 Project Management PM 15
%R 15030 7366 CVX Supplied Information MS 10
%R 15031 7366 MTO MTO 151
%R 15032 7366 34’’ Prototype Valve + 20"" ESD Actuator & Operators (Package 307) 19 104
%R 15033 7366 External Milestones MSEX 152
%R 15034 7366 Output Milestones MSO 154
%R 15035 7366 Management MAN 156
%R 15036 7366 Health Safety & Environment HSE 157
%R 15037 7366 Project Services PS 158
%R 15038 7366 Quality Assurance QA 159
%R 15039 7366 General GENERAL 160
%R 15041 7366 Stabilisation STB 162
%R 15042 7366 Safety & Risk S&R 163
%R 15043 7366 Dredging Option 18 164
%R 15045 7366 Northern Scarp NS 166
%R 15046 7366 Flow Assurance FA 167
%R 15047 7366 Materials & Corrosion MAT 168
%R 15051 7366 Geotechnical GEOTECH 172
%R 15052 7366 Offshore Pipelines OFFP 173
%R 15053 7366 Onshore Pipelines ONSP 174
%R 15054 7366 Trenching TRE 175
%R 15055 7366 Shore Approach SA 180
%R 15058 7366 Subsea SS 200
%R 15061 7366 Pre-Commissioning & Commissioning COM 410
%R 15062 7366 Procurement PROC 510
%R 15063 7366 Contracts CONT 610
%R 15064 7366 Allseas Engagement ALLS 710
%R 15070 7366 Subsea Umbilicals (Package 305) 02 103
%R 15082 7366 Umbilical Lay (Contract 88500008a) 14 126
%R 15083 7366 Heavy Lift Installation (Contract 88500009) 15 130
%R 15084 7366 Offshore Trenching (Contract 88500008b) 16 128
%R 15085 7366 HDD (Contract 88500005b) 17 117
%R 15087 7366 Survey SRV 2410
%R 15088 7367 Milestones MS 10
%R 15090 7367 Studies STD 141
%R 15091 7367 Trials TRI 142
%R 15092 7367 Dredging DR 143
%R 15093 7367 Rock MLOF RD 144
%R 15094 7367 Management MGMT 145
%R 15095 7367 Philosophies & Data PH 146
%R 15096 7367 Engineering Eng 147
%R 15098 7367 Technology Qualification TQ 149
%R 15101 7367 Execution EX 152
%R 15374 7367 Milestones 00 132
%R 15380 7367 Umbilical Procurement 04-1 39
%R 15382 7367 Onshore Tubes & Cables 05-1 41
%R 15383 7367 Jansz Valve Manufacture 06-1 42
%R 15384 7367 Subsea Equipment FEED 07-1 43
%R 15385 7367 Jansz Diverless Connectors 08-1 44
%R 15386 7367 Jansz Control Systems 09-1 47
%R 15387 7367 Jansz Jumpers 10-1 49
%R 15388 7367 Jansz Manifolds 11-1 51
%R 15389 7367 Jansz Subsea Structures 12-1 54
%R 15390 7367 Jansz Pig Launchers 13-1 56
%R 15391 7367 Gorgon Xmas Trees 14-1 58
%R 15392 7367 Jansz Xmas Trees 15-1 59
%R 15393 7367 Jansz Tie-In Spools 16-1 60
%R 15394 7367 Jansz PLETS 17-1 62
%R 15396 7367 System Integration Testing - Jansz Trees 19-1 65
%R 15397 7367 System Integration Testing - Jansz Structures 20-1 66
%R 15398 7367 CRA Linepipe Manufacture 21 67
%R 15399 7367 CS Linepipe Manufacture 22 68
%R 15401 7367 CS Linepipe Coating 24 70
%R 15403 7367 Corrosion Spool Cable 26 72
%R 15404 7367 Barred Trees Qualification & Manufacture 27 73
%R 15405 7367 Flanges Qualification & Manufacture 28 74
%R 15406 7367 Pig Receiver Qualification & Manufacture 29 75
%R 15407 7367 Monolithic Isolation Joint Qualification & Manufacture 30 76
%R 15408 7367 Chemicals ( MEG, Methanol, Etc ) Manufacture 31 77
%R 15409 7367 Rock Quarrying 32 78
%R 15411 7367 Loadout Facilities Construction 34 80
%R 15412 7367 Thrusting Machine Development 35 81
%R 15413 7367 Onshore Materials & Consumables 36 82
%R 15414 7367 Gravity Anchor Fabrication 36A 83
%R 15415 7367 Gorgon Drilling 37 84
%R 15416 7367 Gorgon Well Completion 38 85
%R 15417 7367 Jansz Drilling 39 86
%R 15418 7367 Jansz Well Completion 40 87
%R 15419 7367 Site Preparation 41 88
%R 15420 7367 Pipe Stringing 42 89
%R 15421 7367 HDD Drill Rig Mobilisation 43 90
%R 15422 7367 HDD Construction 44 91
%R 15423 7367 HDD Hydrotesting 44A 92
%R 15424 7367 HDD Construction Marine Support Vessel 45 93
%R 15425 7367 HDD Construction Marine Support Tug 46 94
%R 15426 7367 Shallow Water Pipelines Installation 47 95
%R 15427 7367 Shallow Water Pipelines Mechanical Completion Onshore 48 96
%R 15429 7367 Pipelay Marine Support Vessel 50 98
%R 15430 7367 Survey Vessel 51 99
%R 15431 7367 Deep Water Pipelay 52 100
%R 15432 7367 Pipeline Mechanical Completion Onshore 53 101
%R 15433 7367 Offshore Pipelay Support MSV 54 102
%R 15435 7367 Umbilical Transport Vessel 57 104
%R 15436 7367 Umbilical Installation 58 105
%R 15438 7367 Side Dump Vessels x 2 61 107
%R 15439 7367 Fall Pipe Vessel 62 108
%R 15440 7367 Gravity Anchor Installation Vessel 62A 109
%R 15441 7367 Onshore Pipeline Installation 64 110
%R 15442 7367 Onshore Pipeline Hydrotesting 65 111
%R 15443 7367 Onshore Tubes & Cables Installation 66 112
%R 15444 7367 Shore Station Construction 67 113
%R 15446 7367 Onshore Tie-Ins 69 116
%R 15447 7367 Site Reinstatement 70 117
%R 15448 7367 Structures Installation Jansz - HLV 71J 118
%R 15449 7367 Structures Installation Gorgon - HLV 71G 119
%R 15451 7367 Offshore Tie-Ins - Jansz 73J 121
%R 15452 7367 Offshore Tie-Ins - Gorgon 73G 122
%R 15453 7367 MSV Pre-Commissioning - Jansz 74J 123
%R 15454 7367 MSV Pre-Commissioning - Gorgon 74G 124
%R 15456 7367 Onshore Pre-Commissioning - Jansz 76J 126
%R 15457 7367 Onshore Pre-commissioning - Gorgon 76G 127
%R 15458 7367 North Route Pre Lay Works 77 128
%R 15463 7366 Milestones 00 150
%R 15465 7366 Onshore Tubes & Cables (Package 310) 02-1 112
%R 15466 7366 Subsea Valves (Package 307) 03-1 105
%R 15467 7366 Onshore Valves & Actuators (Package 308a) 04-1 106
%R 15468 7366 Subsea Equipment (Package 302) 05-1 100
%R 15469 7366 System Integration Testing (Package 302) 05A 101
%R 15470 7366 CRA Linepipe & Bends (Package 301) 06-1 16
%R 15471 7366 Carbon Steel Linepipe & Bends (Package 303a/303b/303c) 07-1 15
%R 15472 7366 Linepipe Coating & Anodes (Package 304a) 08-1 99
%R 15473 7366 Offshore Corrosion Spools (Package 302) 09-1 102
%R 15474 7366 Onshore Barred Tees (Package 308c) 09A 107
%R 15475 7366 Onshore Flanges (Package 308b) 09B 108
%R 15476 7366 Onshore Pig Receivers (Package 308d) 09C 109
%R 15477 7366 Onshore Monolithic Isolation Joints (Package 308e) 09D 110
%R 15478 7366 Chemicals (Package 317) 09E 114
%R 15480 7366 Rock Supply (Contract 88500007a) 10-1 138
%R 15481 7366 Loadout Facilities 11-1 11
%R 15484 7366 Gravity Anchor Fabrication & Installation (Contract 88500007b) 14-1 135
%R 15489 7366 HDD (Contract 88500005b) 18A 118
%R 15490 7366 Onshore Pipeline Installation (Contract 88500004) 19-1 132
%R 15492 7366 Jansz Drilling 21 115
%R 15493 7366 Gorgon Drilling 20-1 116
%R 15494 7366 Shore Approach (HDD Contract 88500005b) 22 119
%R 15495 7366 Shallow Water Pipelay (Contract 88500005a) 23 120
2 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?