P5 Graphical Reports

Ahmed SolimanMember for 21 years 2 months
Created
2
2
0
Hello All,
Can P5 generate a Graphical reports through the "Reports" section like P3 can do?

2 replies

Oldest first
  1. 0
    Olby Shaju ·
    Hi,

    The same way as we do in P3 its not possible in P5. Through Resource usage profile what we see can be taken.

    Other than that Primavera has a separate module called as Primavera Charts and Designer thru’ which various reports can be taken.

    Olby
  2. 0
    Ahmed Soliman ·
    thanks my dear