SQL User Names
In the Open Standard
MT
Mike TestroMember for 20 years 10 months
- Created
- 12
- 5
0
Hi All you P6 fanatics
I thought I would install my P6 software and I downloaded a trial version of SQL.
The SQL set up is asking for a user name and password but will not accept whatever I offer and will not suggest an alternative.
Any ideas please?
Best regards
Mike Testro
I thought I would install my P6 software and I downloaded a trial version of SQL.
The SQL set up is asking for a user name and password but will not accept whatever I offer and will not suggest an alternative.
Any ideas please?
Best regards
Mike Testro
12 replies
Oldest first- 0BJBo Johnsen ·Hi Mike,
I vaquely remember something about "sa" (system/server administrator) being either the username or the password on first time installation.
Try google "password sql-server sa" or similar.
There is also something with "admin" (but that is probably for P6). Maybe try combinations of "sa" and "admin", such as "sa"-"sa", or "sa"-"admin", "admin"-"admin", etc.
Best regards,
Bo - 0APArnold Puy ·Hi Mike,
If you open the Microsoft SQL Server 2005 --> SQL Management Studio Express, it will prompt you the "Connect to Server" Box.
Server Type: Database Engine
Server name: Computer Name\PRIMAVERA
Authentication: SQL Server Authentication
Login: sa
Password: Prima123Vera
I am not sure if this is what you are looking for. But you can try it.
Regards,
Arnold - 0RMRodel Marasigan ·Hi Mike,
I’m confused why you need Microsoft SQL trial version where it should be included on the CD1. P6 used SQL Server and Database but it’s included in standalone installation. I suspect you downloaded a SQL Server and driver and not database because Primavera Database are not from Microsoft.
Note: P6.1 database is not the same as P6 .2 v7 database.
P6 default usersname = sa for admin with password Prima123Vera on version P6.1 and not sure on P6.2 v7 if still the same but you can use privuser (usersname and password) or pubuser (usersname and password) all of them are acceptable in P6. - 0MTMike Testro ·Hi All
I am nearly there.
I have the SQL database and the P6 software installed and I am trying to make the 1st launch - and failing.
I am getting the following series of messages:
1st panel - Logon > Admin Password > (Blank) Database > PMDB
2nd Panel > Connecting to Database
3rd Panel > Unable to Connect to Database - would you like to connec now?
4th Panel Validating Datatabase
Username > Pubuser Password ******* (unknown) Public Group > 1
5th Panel > Connection Failed
When hitting the Help button it says that the 4th Panel info should be checked with the computer Admin and that is ME.
Can anybody help?
Best regards
Mike Testro. - 0RMRodel Marasigan ·Hi Mike,
You need to configure the database first. There are two ways to configure your database.
1) You can use Primavera-> Help & Utilities-> Database Configuration
Steps to configure database:
a) When Dialog Configuration Dialog box is up click Next
b) Tick Configure my database configuration then Click Next
c) Tick Project Management Database (PMDB)-> just accept the default PMDB and click Next
d) Select or create Alias (accept the default again & change the Driver type to "Microsoft SQL Server/SQL Service") then click Next
e) Enter the host name ([your computer name]\Primavera) and enter Database name (PMDB$Primavera) as default then click Next
f) Enter Public Login Information "pubuser" for both users name and password then click Next
g) Validate Database Connection - just click Next
h) You should have a message Connection Successful then click Finish
You can now open the Primavera
2) Another way is to Open Primavera and configure database
Step in configuring database using Primavera logon
a) On Login Pop-up click Database textbox [...]
b) Select PMDB and click configure
c) Follow step “c” to “h” on the 1st method steps above
Good Luck
Note: Primavera Login default is admin for both users name and password