EVENT INTERCEPTED

Arsenio Jr. MesaMember for 10 years 10 months
Created
3
1
0
An application event has been intercepted Please note the event code for reference Event code DSEOL-0412-8 Does anyone encountered the same problem while installing P6.? Please let me know how to fix this

3 replies

Oldest first
  1. 0
    Zoltan Palffy ·

    we need a little more

    we need a little more informaiton about the error what does the detail of the error entail ?

  2. 0
    Arsenio Jr. Mesa ·

    Thanks Zoltan This happen to

    Thanks Zoltan This happen to almost daily since I installed P6.. It shows a small window that have the choice between three buttons. "OK" "EXIT" and "More". Every time i choose to click exit, openning the P6 again is not possible because it is unable to connect to the databade and needs to configure the database connection. I uninstalled and reinstalled P6 always to open it again.. I do not know what to do with the "MORE" button if this will work normally or will solved this problem after
  3. 0
    Zoltan Palffy ·

    select the more button and

    select the more button and tell us what the error is there