How can I import MS Project 2013 to Primavera P6 16.1

Thrainn ViggossonMember for 10 years 3 months
Created
3
1
0

I am wanting to import a Microsoft Project Professional schedule over to Primavera but keep getting ''Process completed with errors.  See log file for details'' as a result. 

I am following the steps on the Youtube video here: https://www.youtube.com/watch?v=RM3kAyVCbi8 but still get the same result. 

I am thinking that the error is occuring in the MS Project file and I need to change something to get it to work. The log file is below: 

File path: C:\Users\thrainn\AppData\Local\Temp\20160621_SSN16-Verkáætlun Test 2.primavera.xml
 
Namespace: http://xmlns.oracle.com/Primavera/P6Professional/V16.1/API/BusinessObjects
 
EPS (5963) matched by 5963 from xml
 
Currency 'ISK' (31) matched by 1 from xml
 
UDFType 'MSP Activity ID' (128) matched by 10 from xml
 
Calendar 'PAA' (2442) matched by 11 from xml
 
Calendar 'ístak' (2443) matched by 12 from xml
 
Calendar 'i' (2444) matched by 13 from xml
 
Calendar 'f1' (2445) matched by 14 from xml
 
ResourceCurve (17) matched by 17 from xml
 
ResourceCurve (16) matched by 16 from xml
 
ResourceCurve (19) matched by 19 from xml
 
ResourceCurve (18) matched by 18 from xml
 
ResourceCurve (21) matched by 21 from xml
 
ResourceCurve (20) matched by 20 from xml
 
ResourceCurve (10) matched by 10 from xml
 
ResourceCurve (11) matched by 11 from xml
 
ResourceCurve (12) matched by 12 from xml
 
ResourceCurve (13) matched by 13 from xml
 
ResourceCurve (14) matched by 14 from xml
 
ResourceCurve (15) matched by 15 from xml
 
Unresolved reference null on Resource.
 
Resource 'PAA' (2534) matched by 8 from xml
 
Unresolved reference null on Resource.
 
Resource 'ístak' (2535) matched by 9 from xml
 
Unresolved reference null on Resource.
 
Resource 'i' (2536) matched by 10 from xml
 
Unresolved reference null on Resource.
 
Resource 'f1' (2537) matched by 11 from xml
 
ResourceRate (2556) matched by 1 from xml
 
ResourceRate (2557) matched by 2 from xml
 
ResourceRate (2558) matched by 3 from xml
 
ResourceRate (2559) matched by 4 from xml
 
Project '20160621_SSN16-Verkáætlun Test 2.xml' (1) : Id was shortened from '20160621_SSN16-Verkáætlun Test 2.xml' to '20160621_SSN16-Verká'.
 
Project '20160621_SSN16-Verká' (5567) created according to 1 from xml
 
ProjectObjectId = 5567
 
ProjectObjectId = 5567
 
ProjectObjectId = 5567
 
Calendar 'Standard' (2472) created according to 1 from xml
 
Calendar 'Polsk' (2473) created according to 5 from xml
 
Calendar 'Elapsed Duration Calendar' (2474) created according to 15 from xml
 
ProjectObjectId = 5567
 
ProjectObjectId = 5567
 
WBS '1' (11698) created according to 294 from xml
 
WBS '2' (11699) created according to 384 from xml
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11698
 
ProjectObjectId = 5567
 
ParentObjectId = 11699
 
ProjectObjectId = 5567
 
ParentObjectId = 11699
 
ProjectObjectId = 5567
 
ParentObjectId = 11699
 
WBS '1.1' (11700) created according to 495 from xml
 
WBS '1.2' (11701) created according to 298 from xml
 
WBS '1.3' (11702) created according to 301 from xml
 
WBS '1.4' (11703) created according to 307 from xml
 
WBS '1.5' (11704) created according to 313 from xml
 
WBS '1.6' (11705) created according to 318 from xml
 
WBS '1.7' (11706) created according to 320 from xml
 
WBS '1.8' (11707) created according to 324 from xml
 
WBS '1.9' (11708) created according to 329 from xml
 
WBS '1.10' (11709) created according to 334 from xml
 
WBS '1.11' (11710) created according to 337 from xml
 
WBS '1.12' (11711) created according to 341 from xml
 
WBS '1.13' (11712) created according to 344 from xml
 
WBS '1.14' (11713) created according to 347 from xml
 
WBS '1.15' (11714) created according to 355 from xml
 
WBS '1.16' (11715) created according to 364 from xml
 
WBS '1.17' (11716) created according to 367 from xml
 
WBS '1.18' (11717) created according to 486 from xml
 
WBS '1.19' (11718) created according to 362 from xml
 
WBS '1.20' (11719) created according to 371 from xml
 
WBS '1.21' (11720) created according to 375 from xml
 
WBS '1.22' (11721) created according to 577 from xml
 
WBS '1.23' (11722) created according to 382 from xml
 
WBS '1.24' (11723) created according to 372 from xml
 
WBS '1.25' (11724) created according to 553 from xml
 
WBS '1.26' (11725) created according to 550 from xml
 
WBS '1.27' (11726) created according to 535 from xml
 
WBS '1.28' (11727) created according to 377 from xml
 
WBS '2.1' (11728) created according to 385 from xml
 
WBS '2.2' (11729) created according to 415 from xml
 
WBS '2.3' (11730) created according to 709 from xml
 
ProjectObjectId = 5567
 
ParentObjectId = 11716
 
ProjectObjectId = 5567
 
ParentObjectId = 11721
 
ProjectObjectId = 5567
 
ParentObjectId = 11721
 
ProjectObjectId = 5567
 
ParentObjectId = 11726
 
ProjectObjectId = 5567
 
ParentObjectId = 11726
 
ProjectObjectId = 5567
 
ParentObjectId = 11728
 
ProjectObjectId = 5567
 
ParentObjectId = 11728
 
ProjectObjectId = 5567
 
ParentObjectId = 11728
 
ProjectObjectId = 5567
 
ParentObjectId = 11728
 
ProjectObjectId = 5567
 
ParentObjectId = 11728
 
ProjectObjectId = 5567
 
ParentObjectId = 11728
 
ProjectObjectId = 5567
 
ParentObjectId = 11728
 
ProjectObjectId = 5567
 
ParentObjectId = 11728
 
ProjectObjectId = 5567
 
ParentObjectId = 11729
 
ProjectObjectId = 5567
 
ParentObjectId = 11729
 
ProjectObjectId = 5567
 
ParentObjectId = 11729
 
ProjectObjectId = 5567
 
ParentObjectId = 11729
 
ProjectObjectId = 5567
 
ParentObjectId = 11729
 
ProjectObjectId = 5567
 
ParentObjectId = 11729
 
ProjectObjectId = 5567
 
ParentObjectId = 11729
 
ProjectObjectId = 5567
 
ParentObjectId = 11729
 
ProjectObjectId = 5567
 
ParentObjectId = 11729
 
ProjectObjectId = 5567
 
ParentObjectId = 11729
 
ProjectObjectId = 5567
 
ParentObjectId = 11729
 
ProjectObjectId = 5567
 
ParentObjectId = 11729
 
ProjectObjectId = 5567
 
ParentObjectId = 11729
 
ProjectObjectId = 5567
 
ParentObjectId = 11730
 
WBS '1.17.2' (11731) created according to 689 from xml
 
WBS '1.22.1' (11732) created according to 733 from xml
 
WBS '1.22.2' (11733) created according to 724 from xml
 
WBS '1.27.1' (11734) created according to 534 from xml
 
WBS '1.27.2' (11735) created according to 538 from xml
 
WBS '2.1.1' (11736) created according to 395 from xml
 
WBS '2.1.2' (11737) created according to 413 from xml
 
WBS '2.1.3' (11738) created according to 400 from xml
 
WBS '2.1.4' (11739) created according to 493 from xml
 
WBS '2.1.5' (11740) created according to 386 from xml
 
WBS '2.1.6' (11741) created according to 401 from xml
 
WBS '2.1.7' (11742) created according to 409 from xml
 
WBS '2.1.8' (11743) created according to 407 from xml
 
WBS '2.2.1' (11744) created according to 604 from xml
 
WBS '2.2.2' (11745) created according to 430 from xml
 
WBS '2.2.3' (11746) created according to 644 from xml
 
WBS '2.2.4' (11747) created according to 642 from xml
 
WBS '2.2.5' (11748) created according to 675 from xml
 
WBS '2.2.6' (11749) created according to 454 from xml
 
WBS '2.2.7' (11750) created according to 457 from xml
 
WBS '2.2.8' (11751) created according to 459 from xml
 
WBS '2.2.9' (11752) created according to 461 from xml
 
WBS '2.2.10' (11753) created according to 679 from xml
 
WBS '2.2.11' (11754) created according to 711 from xml
 
WBS '2.2.12' (11755) created according to 466 from xml
 
WBS '2.2.13' (11756) created according to 695 from xml
 
WBS '2.3.1' (11757) created according to 706 from xml
 
ProjectObjectId = 5567
 
ParentObjectId = 11736
 
ProjectObjectId = 5567
 
ParentObjectId = 11736
 
ProjectObjectId = 5567
 
ParentObjectId = 11744
 
ProjectObjectId = 5567
 
ParentObjectId = 11744
 
ProjectObjectId = 5567
 
ParentObjectId = 11745
 
ProjectObjectId = 5567
 
ParentObjectId = 11745
 
ProjectObjectId = 5567
 
ParentObjectId = 11746
 
ProjectObjectId = 5567
 
ParentObjectId = 11746
 
ProjectObjectId = 5567
 
ParentObjectId = 11747
 
ProjectObjectId = 5567
 
ParentObjectId = 11747
 
ProjectObjectId = 5567
 
ParentObjectId = 11755
 
ProjectObjectId = 5567
 
ParentObjectId = 11755
 
ProjectObjectId = 5567
 
ParentObjectId = 11755
 
ProjectObjectId = 5567
 
ParentObjectId = 11755
 
ProjectObjectId = 5567
 
ParentObjectId = 11755
 
ProjectObjectId = 5567
 
ParentObjectId = 11755
 
ProjectObjectId = 5567
 
ParentObjectId = 11756
 
ProjectObjectId = 5567
 
ParentObjectId = 11756
 
WBS '2.1.1.2' (11758) created according to 580 from xml
 
WBS '2.1.1.3' (11759) created according to 582 from xml
 
WBS '2.2.1.1' (11760) created according to 605 from xml
 
WBS '2.2.1.2' (11761) created according to 607 from xml
 
WBS '2.2.2.1' (11762) created according to 598 from xml
 
WBS '2.2.2.2' (11763) created according to 599 from xml
 
WBS '2.2.3.1' (11764) created according to 645 from xml
 
WBS '2.2.3.2' (11765) created according to 654 from xml
 
WBS '2.2.4.1' (11766) created according to 660 from xml
 
WBS '2.2.4.2' (11767) created according to 669 from xml
 
WBS '2.2.12.1' (11768) created according to 618 from xml
 
WBS '2.2.12.2' (11769) created according to 681 from xml
 
WBS '2.2.12.3' (11770) created according to 625 from xml
 
WBS '2.2.12.4' (11771) created according to 622 from xml
 
WBS '2.2.12.5' (11772) created according to 630 from xml
 
WBS '2.2.12.6' (11773) created according to 636 from xml
 
WBS '2.2.13.1' (11774) created according to 694 from xml
 
WBS '2.2.13.2' (11775) created according to 699 from xml
 
CalendarObjectId = 2472
 
WBSObjectId = 11700
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 496
 
CalendarObjectId = 2472
 
WBSObjectId = 11700
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 497
 
CalendarObjectId = 2472
 
WBSObjectId = 11700
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 500
 
CalendarObjectId = 2472
 
WBSObjectId = 11700
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 501
 
CalendarObjectId = 2472
 
WBSObjectId = 11701
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 521
 
CalendarObjectId = 2472
 
WBSObjectId = 11701
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 299
 
CalendarObjectId = 2472
 
WBSObjectId = 11701
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 300
 
CalendarObjectId = 2472
 
WBSObjectId = 11702
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 504
 
CalendarObjectId = 2472
 
WBSObjectId = 11702
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 508
 
CalendarObjectId = 2472
 
WBSObjectId = 11702
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 302
 
CalendarObjectId = 2472
 
WBSObjectId = 11702
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 303
 
CalendarObjectId = 2472
 
WBSObjectId = 11702
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 304
 
CalendarObjectId = 2472
 
WBSObjectId = 11702
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 305
 
CalendarObjectId = 2472
 
WBSObjectId = 11702
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 306
 
CalendarObjectId = 2472
 
WBSObjectId = 11703
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 510
 
CalendarObjectId = 2472
 
WBSObjectId = 11703
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 509
 
CalendarObjectId = 2472
 
WBSObjectId = 11703
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 308
 
CalendarObjectId = 2472
 
WBSObjectId = 11703
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 309
 
CalendarObjectId = 2472
 
WBSObjectId = 11703
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 310
 
CalendarObjectId = 2472
 
WBSObjectId = 11703
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 311
 
CalendarObjectId = 2472
 
WBSObjectId = 11703
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 312
 
CalendarObjectId = 2472
 
WBSObjectId = 11704
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 505
 
CalendarObjectId = 2472
 
WBSObjectId = 11704
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 314
 
CalendarObjectId = 2472
 
WBSObjectId = 11704
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 315
 
CalendarObjectId = 2472
 
WBSObjectId = 11704
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 316
 
CalendarObjectId = 2472
 
WBSObjectId = 11704
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 511
 
CalendarObjectId = 2472
 
WBSObjectId = 11704
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 317
 
CalendarObjectId = 2472
 
WBSObjectId = 11705
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 319
 
CalendarObjectId = 2472
 
WBSObjectId = 11706
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 321
 
CalendarObjectId = 2472
 
WBSObjectId = 11706
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 322
 
CalendarObjectId = 2472
 
WBSObjectId = 11706
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 323
 
CalendarObjectId = 2472
 
WBSObjectId = 11707
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 325
 
CalendarObjectId = 2472
 
WBSObjectId = 11707
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 327
 
CalendarObjectId = 2472
 
WBSObjectId = 11707
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 328
 
CalendarObjectId = 2472
 
WBSObjectId = 11707
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 515
 
CalendarObjectId = 2472
 
WBSObjectId = 11708
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 330
 
CalendarObjectId = 2472
 
WBSObjectId = 11708
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 332
 
CalendarObjectId = 2472
 
WBSObjectId = 11708
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 333
 
CalendarObjectId = 2472
 
WBSObjectId = 11708
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 522
 
CalendarObjectId = 2472
 
WBSObjectId = 11709
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 335
 
CalendarObjectId = 2472
 
WBSObjectId = 11709
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 336
 
CalendarObjectId = 2472
 
WBSObjectId = 11710
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 717
 
CalendarObjectId = 2472
 
WBSObjectId = 11710
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 338
 
CalendarObjectId = 2472
 
WBSObjectId = 11710
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 339
 
CalendarObjectId = 2472
 
WBSObjectId = 11710
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 340
 
CalendarObjectId = 2472
 
WBSObjectId = 11711
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 342
 
CalendarObjectId = 2472
 
WBSObjectId = 11711
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 343
 
CalendarObjectId = 2472
 
WBSObjectId = 11712
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 345
 
CalendarObjectId = 2472
 
WBSObjectId = 11712
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 588
 
CalendarObjectId = 2472
 
WBSObjectId = 11712
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 346
 
CalendarObjectId = 2472
 
WBSObjectId = 11713
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 348
 
CalendarObjectId = 2472
 
WBSObjectId = 11713
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 349
 
CalendarObjectId = 2472
 
WBSObjectId = 11713
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 350
 
CalendarObjectId = 2472
 
WBSObjectId = 11713
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 351
 
CalendarObjectId = 2472
 
WBSObjectId = 11713
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 352
 
CalendarObjectId = 2472
 
WBSObjectId = 11713
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 353
 
CalendarObjectId = 2472
 
WBSObjectId = 11713
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 354
 
CalendarObjectId = 2472
 
WBSObjectId = 11713
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 519
 
CalendarObjectId = 2472
 
WBSObjectId = 11713
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 686
 
CalendarObjectId = 2472
 
WBSObjectId = 11713
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 523
 
CalendarObjectId = 2472
 
WBSObjectId = 11714
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 480
 
CalendarObjectId = 2472
 
WBSObjectId = 11714
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 356
 
CalendarObjectId = 2472
 
WBSObjectId = 11714
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 357
 
CalendarObjectId = 2472
 
WBSObjectId = 11714
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 358
 
CalendarObjectId = 2472
 
WBSObjectId = 11714
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 359
 
CalendarObjectId = 2472
 
WBSObjectId = 11714
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 360
 
CalendarObjectId = 2472
 
WBSObjectId = 11714
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 361
 
CalendarObjectId = 2472
 
WBSObjectId = 11714
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 520
 
CalendarObjectId = 2472
 
WBSObjectId = 11714
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 687
 
CalendarObjectId = 2472
 
WBSObjectId = 11714
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 524
 
CalendarObjectId = 2472
 
WBSObjectId = 11715
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 365
 
CalendarObjectId = 2472
 
WBSObjectId = 11715
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 366
 
CalendarObjectId = 2472
 
WBSObjectId = 11716
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 690
 
CalendarObjectId = 2472
 
WBSObjectId = 11731
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 368
 
CalendarObjectId = 2472
 
WBSObjectId = 11731
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 482
 
CalendarObjectId = 2472
 
WBSObjectId = 11731
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 555
 
CalendarObjectId = 2472
 
WBSObjectId = 11717
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 488
 
CalendarObjectId = 2472
 
WBSObjectId = 11717
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 490
 
CalendarObjectId = 2472
 
WBSObjectId = 11717
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 525
 
CalendarObjectId = 2472
 
WBSObjectId = 11717
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 489
 
CalendarObjectId = 2472
 
WBSObjectId = 11718
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 363
 
CalendarObjectId = 2472
 
WBSObjectId = 11718
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 557
 
CalendarObjectId = 2472
 
WBSObjectId = 11719
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 527
 
CalendarObjectId = 2472
 
WBSObjectId = 11719
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 528
 
CalendarObjectId = 2472
 
WBSObjectId = 11720
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 575
 
CalendarObjectId = 2472
 
WBSObjectId = 11720
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 530
 
CalendarObjectId = 2472
 
WBSObjectId = 11732
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 732
 
CalendarObjectId = 2472
 
WBSObjectId = 11732
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 731
 
CalendarObjectId = 2472
 
WBSObjectId = 11732
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 730
 
CalendarObjectId = 2472
 
WBSObjectId = 11732
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 729
 
CalendarObjectId = 2472
 
WBSObjectId = 11733
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 574
 
CalendarObjectId = 2472
 
WBSObjectId = 11733
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 576
 
CalendarObjectId = 2472
 
WBSObjectId = 11733
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 529
 
CalendarObjectId = 2472
 
WBSObjectId = 11733
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 376
 
CalendarObjectId = 2472
 
WBSObjectId = 11722
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 573
 
CalendarObjectId = 2472
 
WBSObjectId = 11722
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 383
 
CalendarObjectId = 2472
 
WBSObjectId = 11723
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 373
 
CalendarObjectId = 2472
 
WBSObjectId = 11723
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 374
 
CalendarObjectId = 2472
 
WBSObjectId = 11724
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 719
 
CalendarObjectId = 2472
 
WBSObjectId = 11724
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 551
 
CalendarObjectId = 2472
 
WBSObjectId = 11725
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 554
 
CalendarObjectId = 2472
 
WBSObjectId = 11725
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 552
 
CalendarObjectId = 2472
 
WBSObjectId = 11725
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 715
 
CalendarObjectId = 2472
 
WBSObjectId = 11734
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 560
 
CalendarObjectId = 2472
 
WBSObjectId = 11734
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 559
 
CalendarObjectId = 2472
 
WBSObjectId = 11734
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 558
 
CalendarObjectId = 2472
 
WBSObjectId = 11734
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 546
 
CalendarObjectId = 2472
 
WBSObjectId = 11734
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 545
 
CalendarObjectId = 2472
 
WBSObjectId = 11735
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 562
 
CalendarObjectId = 2472
 
WBSObjectId = 11727
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 378
 
CalendarObjectId = 2472
 
WBSObjectId = 11727
 
ProjectObjectId = 5567
 
UDFTypeObjectId = 10, DataType = Text, Value = 381
 
WARNING: Referenced business object Calendar with object id 0 cannot be found, ignoring field CalendarObjectId on business object Activity '146' (532)
 
ProjectObjectId = 5567
 
SEVERE: Unable to invoke setName on business object Activity. Field "Name" in Activity may not be of zero length.
 
com.primavera.integration.client.xml.xmlimporter.XMLImporterException: Unable to invoke setName on business object Activity. Field "Name" in Activity may not be of zero length.
at com.primavera.integration.client.xml.xmlimporter.handler.b.a(DefaultProcessor.java:680)
at com.primavera.integration.client.xml.xmlimporter.handler.b.a(DefaultProcessor.java:123)
at com.primavera.integration.client.xml.xmlimporter.handler.b.a(DefaultProcessor.java:723)
at com.primavera.integration.client.xml.xmlimporter.d.a(ImportWorker.java:710)
at com.primavera.integration.client.xml.xmlimporter.d.a(ImportWorker.java:283)
at com.primavera.integration.client.xml.xmlimporter.d.a(ImportWorker.java:203)
at com.primavera.integration.client.xml.xmlimporter.d.a(ImportWorker.java:98)
at com.primavera.integration.client.xml.xmlimporter.XMLImporter.createNewProject(XMLImporter.java:529)
at com.primavera.integration.app.importexport.ImportExportAction.a(ImportExportAction.java:664)
at com.primavera.integration.app.importexport.ImportExportAction.f(ImportExportAction.java:580)
at com.primavera.integration.app.importexport.ImportExportAction.b(ImportExportAction.java:262)
at com.primavera.integration.app.importexport.ImportExportMain.main(ImportExportMain.java:36)
Original Exception:
com.primavera.integration.client.bo.BusinessObjectException: Unable to invoke setName on business object Activity. Field "Name" in Activity may not be of zero length.
at com.primavera.integration.client.bo.BOHelperImpl.setValue(BOHelperImpl.java:731)
at com.primavera.integration.client.xml.io.converter.c.toBusinessObject(DefaultConverter.java:121)
at com.primavera.integration.client.xml.xmlimporter.handler.b.a(DefaultProcessor.java:640)
at com.primavera.integration.client.xml.xmlimporter.handler.b.a(DefaultProcessor.java:123)
at com.primavera.integration.client.xml.xmlimporter.handler.b.a(DefaultProcessor.java:723)
at com.primavera.integration.client.xml.xmlimporter.d.a(ImportWorker.java:710)
at com.primavera.integration.client.xml.xmlimporter.d.a(ImportWorker.java:283)
at com.primavera.integration.client.xml.xmlimporter.d.a(ImportWorker.java:203)
at com.primavera.integration.client.xml.xmlimporter.d.a(ImportWorker.java:98)
at com.primavera.integration.client.xml.xmlimporter.XMLImporter.createNewProject(XMLImporter.java:529)
at com.primavera.integration.app.importexport.ImportExportAction.a(ImportExportAction.java:664)
at com.primavera.integration.app.importexport.ImportExportAction.f(ImportExportAction.java:580)
at com.primavera.integration.app.importexport.ImportExportAction.b(ImportExportAction.java:262)
at com.primavera.integration.app.importexport.ImportExportMain.main(ImportExportMain.java:36)
Original Exception:
java.lang.reflect.InvocationTargetException
at sun.reflect.GeneratedMethodAccessor33.invoke(Unknown Source)
at sun.reflect.DelegatingMethodAccessorImpl.invoke(Unknown Source)
at java.lang.reflect.Method.invoke(Unknown Source)
at com.primavera.integration.client.bo.BOHelperImpl.setValue(BOHelperImpl.java:727)
at com.primavera.integration.client.xml.io.converter.c.toBusinessObject(DefaultConverter.java:121)
at com.primavera.integration.client.xml.xmlimporter.handler.b.a(DefaultProcessor.java:640)
at com.primavera.integration.client.xml.xmlimporter.handler.b.a(DefaultProcessor.java:123)
at com.primavera.integration.client.xml.xmlimporter.handler.b.a(DefaultProcessor.java:723)
at com.primavera.integration.client.xml.xmlimporter.d.a(ImportWorker.java:710)
at com.primavera.integration.client.xml.xmlimporter.d.a(ImportWorker.java:283)
at com.primavera.integration.client.xml.xmlimporter.d.a(ImportWorker.java:203)
at com.primavera.integration.client.xml.xmlimporter.d.a(ImportWorker.java:98)
at com.primavera.integration.client.xml.xmlimporter.XMLImporter.createNewProject(XMLImporter.java:529)
at com.primavera.integration.app.importexport.ImportExportAction.a(ImportExportAction.java:664)
at com.primavera.integration.app.importexport.ImportExportAction.f(ImportExportAction.java:580)
at com.primavera.integration.app.importexport.ImportExportAction.b(ImportExportAction.java:262)
at com.primavera.integration.app.importexport.ImportExportMain.main(ImportExportMain.java:36)
Caused by: com.primavera.integration.client.bo.InvalidValueException: Field "Name" in Activity may not be of zero length.
at com.primavera.integration.client.bo.object.Activity.setName(Activity.java:1086)
... 17 more

3 replies

Oldest first
  1. 0
    Tim Neobard ·

    Make sure you remove any

    Make sure you remove any "asthetic" blank lines.

    Activity '146' (532) ProjectObjectId = 5567 SEVERE: Unable to invoke setName on business object Activity. Field "Name" in Activity may not be of zero length.

  2. 0
    Tim Neobard ·

    duplicate

    duplicate

  3. 0
    Zoltan Palffy ·

    try importing a mpx instead

    try importing a mpx instead of an xlm

Log in or join to reply

ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.

Existing members: your original username and password still work. Forgot password?