P6 with Arabic script

Gün GöksuMember for 21 years 6 months
Created
0
2
0

Hi everyone,

I have received a standard P6 v8.2 P6 XER file (encoded in ANSI).

There are some arabic writting wisible in the encoding is changed to Windows-1256.

Importing this to P6 v15.2 gives griberish. does not correct when font is changed to arabic.

 

There was a way to get these arabic scripts to be visible properly. Anyone remember how?

 

Thanks.

Gün Göksu

Replies

Oldest first

No replies yet. Be the first to answer.

Log in or join to reply