how do you turn the P6 "enter bell" off? that noise that occurs everytime you type anything..

John ReevesMember for 13 years 5 months
Created
3
4
0

how do you turn the P6 "enter bell" off? that noise that occurs everytime you type anything..(I normally just turn my system volume off but sometimes I have to listen to something as well working...) - this might be the most important question ever posted.

3 replies

Oldest first
  1. 0
    Rodel Marasigan ·

    It's not P6. It's application

    It's not P6. It's application sound. If you wanted to turn off the application annoying sound:

    1 click Start (Window Logo)
    2 select Settings then click System
    3 on the left side of the screen click Sound
    4 scroll down until you see Advance sound options
    5 click App volume and device preferences
    6 under the App System Sound you can either slide the volume to 0 or click the speaker icon to have it mute

    Try to do something in P6 if the annoying sound still exist. If not you can close the settings window. You can play music and you can still hear the music play. Sometime if you play some sound it automatically remove the system mute but you can always put it in the app system mute and still hear other sounds but not the app annoying sound.

  2. 0
    Rafael Davila ·

    That every time you hit the

    • That every time you hit the enter key if using P6 there is an annoying bell noise is hard to believe!
    • I do not even know how to make it happen if using Excel, Word, Power Point, Spider Project, AutoCad nor any software I use.
    • If everything fails consider switching software, not all software is so annoying.

    Good Luck

  3. 0
    Santosh Bhat ·

    John, start pressing the TAB

    John, start pressing the TAB key (or SHIFT+TAB to go backwards) instead of enter - no noise!

    Also when you're in a cell in the bottom, for exmaple the duration cell, pressing PG Up and PG Down takes you to the next/previous activity but staying in the same cell.