Steel fixing productivty

MVN SatyanarayanaMember for 21 years
Created
6
6
0
Can anyone help me with the steel fixing produtivity for bridges in dubai per steel fixer (South asian steel fixers).

6 replies

Oldest first
  1. 0
    Abhijit Kale ·
    Dear Satya,
    Steel, u mean to say reinforcement steel, or structural steel for shuttering stagging?

    cheers,
    Abhi
  2. 0
    Charleston-Joseph Orbe ·
    Abijat,

    it means steel reinforcement.

    my conclusion base on manpower used "steel fixer".

    you dont need steel fixer in structural steel since for structural steel you need welders (structural welder)
  3. 0
    MVN Satyanarayana ·
    Thanx for all the responses.

    I got the productivity required
  4. 0
    Kier Legard ·
    HI MVN,

    Follow this link.



    http://www.methvin.org/ProductionRates/tabid/229/Default.aspx


    Regards

    kier
  5. 0
    Abhijit Kale ·
  6. 0
    Abhijit Kale ·
    thanx Charlaston,

    I missed that word.
    thanx for reminding.
    cheers,
    Abhi