Carbon steel productivity rate

Kier LegardMember for 20 years 2 months
Created
1
4
0

Hi to all,

Does anybody what is the productivity rate for prefabrication and erection of carbon steel in Kgs.


Regards,
kier

1 reply

Oldest first
  1. 0
    Kier Legard ·
    Hi to all


    Are these values correct.

    Activity description kg/mh
    PREF.PIPING > 2 C.S.(AV.32,98) 55.55200327
    U.G PIPING C.S. (AVE.32,98 IN) 33.0002508
    ER.PIP.A.G.>2 C.S.(AV.32,98IN) 41.66403672


    Regards
    kier