Pipe productivity rate

Anu TorMember for 19 years 7 months
Created
2
2
0
Dear all,

Please tell me for piping productivity rate in DBI/day/welder as,
- Prefabrication
- Erection

Thanks,

2 replies

Oldest first
  1. 0
    Abhijit Kale ·
    Dear Anu,
    The productivity depends upon the time cycle required for completing an activity.
    time cycle depends upon, many factors,such as:
    1.Diameter of Pipe.
    2.Man power deployed
    3.Equipemnt deployed.
    4. Location and climateic conditions

    you have given to little information in your querry.

    At least mention the diameter of pipe.
    cheers,
    Abhi
  2. 0
    Dilip Konar ·

    i want to rate analysis of

    i want to rate analysis of 2500mm dia pipe making with 20mm thickness Mild steel sheet. with material cost