Planning & Scheduling Basics

Rola SabbahMember for 16 years 10 months
Created
2
5
0
hi every body,
i wanted to ask about basic concepts which are taken into consideration when definig relationships between activiites.
for example Activity A and B. B starts after A and Finishes after A finish, so you make B successor to A with FF relationship, and if the duration of B is larger than A, make a proper lag, to ensure that B dosn’t finish before A and dosn’t start before it.
What other kind of rules or common practise? and is there preferable relatoins between some construction activities?
Any books or article we can learn from ?
Thanks

2 replies

Oldest first
  1. 0
    Samer Zawaydeh ·
    Dear Rola,

    Start with the CMU website and read up as much as you can. Then you can have a look at the Standard Practice of Scheduling by PMI.

    http://pmbook.ce.cmu.edu/09_Construction_Planning.html

    http://www.pmi.org/PDF/PS_Scheduling.pdf

    A good reference would be the "PSP Certification Study Guide" as well.

    With kind regards,

    Samer
  2. 0
    Shah. HB ·
    Hi

    you can check this link

    http://www.mosaicprojects.com.au/Resources_Papers_Alpha.html#Top