Planning for Green Buildings
In the Open Standard
Yazan BdairMember for 10 years 7 months
- Created
- 0
- 4
0
Hello everyone ,
any body has an information about Planning ( Time schedule and Cost estimation ) for Green Buildings ??
and what the effect of Green on the Plan
I mean >> If there are two buildings that are same in the Structural and Architectural design
one of them is Green Building and the other not
what the difference in plan between them ?
Thanks alot