How to retrieve Primavera P6 Ver8.3.2 project schedule and database Oracle XE from dead laptop
In the Open Standard
Aswadimanor SafeieMember for 16 years
- Created
- 0
- 3
0
Dear all,
I having problems to retrieve all data from my dead laptop hard disk and transfer to new laptop. Lucky the hard disk still ok,
The version P6 installed in the previous laptop is P6 Ver 8.3.2 and Database using Oracle XE.
Please guide me step by step how do.
Thanks.
Aswadimanor