Hi All,

I'm looking for a table that gives the rates of placement for industrial construction - example how many hours does it take to put in a cubic meter of concrete (generally).  I looked through the forum and found a couple of links that don't work anymore.  Can anyone point me in the right direction?

TIA!

1 reply

Oldest first
  1. 0
    Zoltan Palffy ·

    on this site up top there is

    on this site up top there is a tab called Build Times

    http://www.planningplanet.com/wiki/422384/rates-norms-durations