Skip to content

Why larger pdf file size when using Windows XP?

P3 SchedulerMember for 24 years 8 months
Created
1
5
0
pdf file size generated is 10 times larger when using Windows XP vs Windows Me!
-------------------------------------------------------------------

I have just upgraded my laptop to Pentium 4 with Windows XP and found that the pdf files generated are almost 10 times larger in size compared to when I was using Windows Me.

I am using Adobe Abrobat 4.0 (in both cases) and the settings for the output are the same as when I was using Windows Me. Any clue why this is the case?

Thank you and best regards,
CS Ong

1 reply

Oldest first
  1. 0
    Nihat Yildirim ·
    I think this is not about P3 but PDF writer or distiller.
    Did you check the resolution setting for distiller(assuming that you are using distiller)?

Log in or join to reply

ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.

Existing members: your original username and password still work. Forgot password?