Access P3 Config
In the Open Standard
Forum GuestMember for 17 years 8 months
- Created
- 2
- 2
0
Hi there
I was just wondering if someone can help me with this:
I want to be able to use the auto unlink to unlink relationships that I linked manually. (this works only if the relationship was linked using the auto link function)
This can be done by altering the P3 Config files (?), the problem is I cannot locate them, please help.
Thank you very much muchas gracias
Chin Sai Mun, Sunway Constrcution
I was just wondering if someone can help me with this:
I want to be able to use the auto unlink to unlink relationships that I linked manually. (this works only if the relationship was linked using the auto link function)
This can be done by altering the P3 Config files (?), the problem is I cannot locate them, please help.
Thank you very much muchas gracias
Chin Sai Mun, Sunway Constrcution
2 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?