Link P3 to Pervasive.SQL 2000

Alex GörgMember for 22 years 5 months
Created
3
1
0
Hello

I would like to link our P3 Projects to a Pervasive.SQL 2000 Database. It´s still running with shared folders. I read in P3 Readme "Using Pervasive Server Engine" that i need a technical document to configurate this. My question is, has anybody this document or another operating instruction to do this.
Thankx for everything to fix my problem

Alex

3 replies

Oldest first
  1. 0
    Mk Tse ·
    You need to purchase Pervasive.SQL 2000, both server and client.
    Create a partition on server to allow Pervasive server installation. P3 project will be stored in this volume. For client machine, install Pervasive client.
    Make sure all client machines have Pervasive install if access to server to open the P3 project.
  2. 0
    Forum Guest ·
    Thanks

    I tried to link the ddf files by using a Pervasive ODBC driver and i get access to the tables without the client.
    I´m not a professinal so can anybody give me a step by step introduction to install first a 2k3 server and than i have to install the pervasive.sql server or better primavera local installation with to copy the files of the project folder.
  3. 0
    Mk Tse ·
    We do installation long time ago and I forget some steps. However, when purchase the software, there are manuals. Read careful to the installation guide and some associated document from Sybase web and knowledge before installation.

    My experience is some window files will be deleted after installation or version is not correct. We manual copy and paste those files to window folder.