Install P3 and Btreive
In the Open Standard
Liliane FARRANMember for 22 years 3 months
- Created
- 2
- 1
0
Hello
I have tried to install P3 on my PC and it works. But after the installation i couldn’t launch the program as an error occurs: " can’t divide by zero". So I uninstall it and tried to do the setup again. Now I am not able even to do the setup. The system is telling me that the "P3setup requires at least Btreive version6. An earlier version is detected or in use. Close other Btreive applications and rerun P3 setup"
What shall I do now? I think that something has change in my system files. Can anybody help me?
I have tried to install P3 on my PC and it works. But after the installation i couldn’t launch the program as an error occurs: " can’t divide by zero". So I uninstall it and tried to do the setup again. Now I am not able even to do the setup. The system is telling me that the "P3setup requires at least Btreive version6. An earlier version is detected or in use. Close other Btreive applications and rerun P3 setup"
What shall I do now? I think that something has change in my system files. Can anybody help me?
2 replies
Oldest firstLog in or join to reply