Lose work when saving after using suretrak wizard!

K MasonMember for 22 years 2 months
Created
2
2
0
Hi,
I’ve never had formal training using suretrak, and occasionally (2 of 3 times) the program loses all the work I’ve done using the kickstart wizard when I try to save. It comes up with an error message: (filename).MPX not found. I am saving directly to the C: drive.

2 replies

Oldest first
  1. 0
    Mk Tse ·
    .MPX? It is Project 98 or Project 4.0 file extension.
  2. 0
    Jorge Taguinod ·
    Hi,

    My advice is for you to get the training and get rid of the Kickstart Wizard. This way, SureTrak will be easier to use.

    Good luck.