Yes you got it - WE DO NOT NEED THE TRUE FUNCTION OF ENTERPRISE. THIS IS THE POINT, IF YOU DO NOT NEED IT IT DONT COMPLICATE THINGS, IF ON THE OTHER HAND YOU NEED IT, GET IT.
- we dont use nor need time cards for scheduling functions, some of our Contractors keep track of employees at the job level using hand recognition systems integrated into their accounting and job costing, not into their scheduling sotware. I guess those with Timberline Accounting could integrate both, but do not.
- our contractor’s dont use named resources at the planning level they use trades, they let front end supervisors distribute their crew.
- they all have Structured EPS / OBS / RBS
yes even RBS, they have crews.
- we use Expedition 9.0 on the Web for our needs, a great product not substituted by a CPM tool. Although not a true Document Control System it is our best option, above available true document control systems.
- we dont use nor need time cards for scheduling functions, some of our Contractors keep track of employees at the job level using hand recognition systems integrated into their accounting and job costing, not into their scheduling sotware. I guess those with Timberline Accounting could integrate both, but do not.
- our contractor’s dont use named resources at the planning level they use trades, they let front end supervisors distribute their crew.
- they all have Structured EPS / OBS / RBS
yes even RBS, they have crews.
- we use Expedition 9.0 on the Web for our needs, a great product not substituted by a CPM tool. Although not a true Document Control System it is our best option, above available true document control systems.
62 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?