Resource Curves
In the Open Standard
Erik JonkerMember for 23 years 6 months
- Created
- 5
- 1
0
I find P3 the earned value calculation of resource curves aren’t applicable to any real scheduling activities.
They can not be used for any activities where the actual duration can be longer or shorter than the original duration.
Can they be in used in any detailed schedule? Because if everything went perfectly as per schedule, why need schedulers?
Like to see what everybody thinks.
They can not be used for any activities where the actual duration can be longer or shorter than the original duration.
Can they be in used in any detailed schedule? Because if everything went perfectly as per schedule, why need schedulers?
Like to see what everybody thinks.
5 replies