Update discrepancy
In the Open Standard
Ismail VandeliwalaMember for 22 years 5 months
- Created
- 9
- 4
0
Currently after update i have found a peculiar situation in my update. There is an activity with a single predecessor and successor, the total float of this activity is very high and in no way co-relates to the backwardpass calculations of the schedule. Both the predessor and the successor of the activity have a FS link.
Has anyone experienced this before and can explain to me why it is happenning and what’s the solution.
Has anyone experienced this before and can explain to me why it is happenning and what’s the solution.