Can not start or setup P3
In the Open Standard
Marcio SampaioMember for 20 years 11 months
- Created
- 4
- 1
0
Dear All
I loaded the Pervasive ODBC driver on my computer.
After that i cant start P3 and have massage "A serial
number could not be locked "
I tried to uninstall P3 and reinstall but i had error
massage " P3 Setup
Error: (20) Record manager inactive"
Kind regards.
Marcio Eduardo
Rio de Janeiro - Brazil
I loaded the Pervasive ODBC driver on my computer.
After that i cant start P3 and have massage "A serial
number could not be locked "
I tried to uninstall P3 and reinstall but i had error
massage " P3 Setup
Error: (20) Record manager inactive"
Kind regards.
Marcio Eduardo
Rio de Janeiro - Brazil