Hi,
anyone can tell me how to do a Spell Check in P3 3.1

Regards
Jagath

7 replies

Oldest first
  1. 0
    Nigel Winkley ·
    Quick way is to copy all activities, paste into Excel or Word then run a spell check and note the errors. Go back to P3 and manually make the corrects.

    Or spell it right the first time!

    Nige
  2. 0
    Dayanidhi Dhandapany ·
    I think there is a separate Spell check(additional application)available for P3.
  3. 0
    Emily Ward ·
    There is a spell checker on the CD. Go to solution 2003919153114 on the primavera knowledgebase for details on its installation.

    Emily
  4. 0
    Zhang Haixiang ·
    you can find a small program of spelling check on P3 CD
  5. 0
    David Andreotti ·
    Suretrak has one. If you have suretrak, save the p3 file as a concentric or project groups and open it in Suretrak.
  6. 0
    John McDonald ·
    Rather than cut and pate I export all my descrip fields and logs spell check in excel and then simply import - my spelling is terrabel lol
  7. 0
    Zhang Haixiang ·
    These is a small program on P3 CD, under RA section