Resource Levelling
In the Open Standard
Paula WalshMember for 20 years 4 months
- Created
- 11
- 3
0
I am scheduling a construction project with multiple stages of work continuously taking place on one large site. The crane that will be used for this entire project must do one complete unit then move to the next, but it is not involved in all of the activities in the unit. Once the 2nd unit is completed the crane will then move on to the next unit. There is work taking place at each unit before and after the crane is there.
When I resource level in Primavera Version 5.0 the crane gets spread out over all the units. This is not possible in real life, as the crane takes 1-2 days to demobilize and reset up at a new unit. How can I tell Primavera that I want the crane (marked as a resource) to stay at one unit before moving onto the next, and then so on for the rest of the 120 units?
Thank you.
When I resource level in Primavera Version 5.0 the crane gets spread out over all the units. This is not possible in real life, as the crane takes 1-2 days to demobilize and reset up at a new unit. How can I tell Primavera that I want the crane (marked as a resource) to stay at one unit before moving onto the next, and then so on for the rest of the 120 units?
Thank you.
11 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?