Resource loading based on late dates.
In the Open Standard
Tahir Naseem PMP, CCEMember for 19 years 11 months
- Created
- 4
- 1
0
Dear All
I prepared S-curve in excel after getting resource loading report from P3 because client need some makeup & good looking format. Any how this will not affect on data. My problem is that this resource loading available only based on early dates. I want to prepare the same for late dates.
For the graphical report P3 provide the both but for the tabular report has this limitation. If some one has any idea / solution to guide me.
Regards
Tahir
I prepared S-curve in excel after getting resource loading report from P3 because client need some makeup & good looking format. Any how this will not affect on data. My problem is that this resource loading available only based on early dates. I want to prepare the same for late dates.
For the graphical report P3 provide the both but for the tabular report has this limitation. If some one has any idea / solution to guide me.
Regards
Tahir
4 replies
Oldest firstLog in or join to reply