Link between MS Excel to P3 3.1 via ODBC.....
In the Open Standard
Suraj ThakurMember for 20 years 3 months
- Created
- 4
- 2
0
Hi all,
I am using Pervasive ODBC driver to connect to PRIMAVERA v 3.1. I have successfully installed & configured it.
I have access to Primavera thru Excel/Tool/Get External Data...Ther is no problem in pulling out data from P3.
But changes that i make in Excel does not get reflected in Primavera..
where as if i make changes using MS SQL then it gets updated in Primavera, But SQL is as tediuos as P3.1.
So how can i make link to work from Excel to update/change in Primavera 3.1.
regards,
I am using Pervasive ODBC driver to connect to PRIMAVERA v 3.1. I have successfully installed & configured it.
I have access to Primavera thru Excel/Tool/Get External Data...Ther is no problem in pulling out data from P3.
But changes that i make in Excel does not get reflected in Primavera..
where as if i make changes using MS SQL then it gets updated in Primavera, But SQL is as tediuos as P3.1.
So how can i make link to work from Excel to update/change in Primavera 3.1.
regards,
4 replies
Oldest firstLog in or join to reply