Dimitri RadenacMember for 18 years 11 months
Created
4
4
0
Hi,

I just start a project in south korea, i’m working with suretrak, and my problem is that my version doesn’t recognize korean character.

If you can help me to solve this, it will really help me !!

Thanks

Dimitri

4 replies

Oldest first
  1. 0
    Hannes de Bruyne ·
    hi dimitri

    maybe this can be solved, but more information is needed:

    does the normal Arial support Korean?

    was there a korean font in the good old windows 95 time the way it was for greek letters something like arialkorean.fnt?

    can korean be compared with our alphabet?

    if the answer is 3x yes it might be possible. As P3 does not support korean charactors some tricks mut be used.
  2. 0
    Mehdi Rashidi Alangeh ·
    Hi,
    You must install some korea fonts into Winxp . this problem solved by windows.
  3. 0
    Dimitri Radenac ·
    hi!!

    first of all, thank you very much to reply me, i appreciate it.

    My xp version doesn’t seem to get the korean font. Do you know where i can download it? I have looking for with google, it doesn’t seem so easy to find it.

    Thank you.


    Dimitri
  4. 0
    Dimitri Radenac ·
    hi again :)

    after verifications, it seem i have the korean font in my laptop but suretrack need korean font AND a version of windows from asia.

    Have you heard about that?

    Thank you

    Dimitri

Log in or join to reply