Excel 2007
In the Open Standard
Aytac ErdoganMember for 19 years 1 month
- Created
- 4
- 1
0
I have just installed excel 2007 but there is a problem about primavera P 3.1 import-export fonction. The files that ı exported to "P3 out" folder cannot be recognized.
Is there anyone who faced this problen after installing excel 2007? so, what can we do?
Is there anyone who faced this problen after installing excel 2007? so, what can we do?