Skip to content

p3 ver 3.1, saving layouts as PDF file

David TinwellMember for 18 years 8 months
Created
2
1
0
Hi Guys,
i need the bug fix to allow the saving of p3 layouts as PDF files in version 3.1. I know a patch exists, if anyone knows where i can find it please send me the link or the patch.

thanks

David

2 replies

Oldest first
  1. 0
    A D ·
    u can download it from www.cutepdf.com or www.verypdf.com

    Cheers,

    Ravi
  2. 0
    David Tinwell ·
    Thanks Ravi, that works

Log in or join to reply

ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.

Existing members: your original username and password still work. Forgot password?