P3 Error

Imran MalikMember for 22 years 4 months
Created
2
2
0
Please let me know hot to fix following error for Primavera 3

"Application Error"
P3 caused General Protection Fault in module P3CC.DLL at 0003:C3D2. Choose close. P3 will close.


Regards
Imran

2 replies

Oldest first
  1. 0
    John Raper ·
    Imran

    P3 is quite a robust programme so GPFs should be rare.

    First check that you have all the service packs installed. Go to Help>About and the top line should be ’Primavera Project Planner Version 3.1 SP3’. If it’s not then you need to download Service Pack 3 from the Primavera web site. It does not come on the install discs!

    If you do have SP3 then it’s down to your PC, so I can’t really help. I could suggest upping the memory, unloading other applications etc. but that’s about all.
  2. 0
    Imran Malik ·
    Thanks john