How to link Crystal Reports and P3?

David BallMember for 19 years 2 months
Created
1
1
0
Hi,

If I have P3 and Crystal Reports on the same PC do I need Pervasive ODBC driver?

Where can I download Pervasive ODBC driver?

Thanks so much.

1 reply

Oldest first
  1. 0
    Marc Borburgh ·
    Hi David,

    I’ve put the ODBC drivers for Pervasive on my personal web space where you can download them (http://bobohq.gotdns.com/files/)